OpenLegislation

Division Section 11 Official controls regarding hydrolysis with subsequent disposalF1

United Kingdom

Original text. Later amendments are not shown.

The competent authority shall carry out controls at sites where hydrolysis with subsequent disposal is carried out in accordance with point B of Section 2 of Chapter V of Annex IX.

Such controls shall, for the purpose of reconciliation of the quantities of hydrolysed materials dispatched and disposed of, include documentary checks:

  1. (a)

    of the amount of materials which are hydrolysed at the site;

  2. (b)

    in the establishments or plants where the hydrolysed materials are disposed of.

Controls shall be carried out regularly on the basis of a risk assessment.

During the period of the first 12 months of operation, a control visit to a site, where a container for the hydrolysis is located, shall be carried out every time hydrolysed material is collected from the container.

Following the period of the first 12 months of operation, a control visit to such sites shall be carried out every time the container is emptied and checked for the absence of corrosion and leaking in accordance with point B(3)(j) of Section 2 of Chapter V of Annex IX.

Annotations

Textual amendments

F1

Inserted by Commission Regulation (EU) 2020/762 of 9 June 2020 amending Regulation (EU) No 142/2011 as regards microbiological standards for raw petfood, requirements concerning approved establishments, technical parameters applicable to the alternative method Brookes’ gasification process and hydrolysis of rendered fats, and exports of processed manure, certain blood, blood products and intermediate products (Text with EEA relevance).