Division 7 Extension and delayF1
Any delay in relation to the time limits set in sections 1 to 5 in this Annex must be reported by the responsible TAB to the Secretary of State.
If an extension of the time limits for developing the UK Assessment Document can be justified, notably by the absence of a Secretary of State decision on the applicable system of assessment and verification of constancy of performance for the construction product or by the need to develop a new test method, the Secretary of State is to set an extended time limit.
Annotations
Textual amendments
- F1
Annex 2 substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 66 (with Sch. 1 para. 70) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 paras. 12, 17); 2020 c. 1, Sch. 5 para. 1(1)