Division 1.5 System 4F1
United Kingdom
- (a)
The manufacturer shall carry out:
- (i)
an assessment of the performance of the construction product on the basis of testing, calculation, tabulated values or descriptive documentation of that product;
- (ii)
factory production control.
- (i)
- (b)
No tasks require the intervention of F2approved bodies.
Annotations
Textual amendments
- F1
- F2
Word in Annex 5 Point 1 substituted (31.12.2020) by The Construction Products (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/465), reg. 1, Sch. 1 para. 69(2) (with Sch. 1 paras. 70, 75) (as amended by S.I. 2020/1359, reg. 1, Sch. 1 paras. 16, 17); 2020 c. 1, Sch. 5 para. 1(1)