Division 1 Common elements for installations and aircraft operators
United Kingdom
- (1)
The monitoring plan approved by the competent authority;
- (2)
F1Documents justifying the selection of the monitoring methodology and the documents justifying temporal or non-temporal changes of monitoring methodologies and, where applicable, tiers approved by the competent authority;
- (3)
All relevant updates of monitoring plans notified to the competent authority in accordance with Article 15, and the competent authority’s replies;
- (4)
All written procedures referred to in the monitoring plan, including the sampling plan where relevant, the procedures for data flow activities and the procedures for control activities;
- (5)
A list of all versions used of the monitoring plan and all related procedures;
- (6)
Documentation of the responsibilities in connection to the monitoring and reporting;
- (7)
The risk assessment performed by the operator or aircraft operator, where applicable;
- (8)
The improvement reports in accordance with Article 69;
- (9)
The verified annual emission report;
- (10)
The verification report;
- (11)
Any other information that is identified as required for the verification of the annual emissions report.