Division (f) Coordination of clearances
United Kingdom
- (1)Division (1)
- (2)An aircraft shall be cleared for the entire route to the aerodrome of first intended landing:
- (3)Division (3)
- (4)When prescribed by the ATS unit, aircraft shall contact a downstream air traffic control unit, for the purpose of receiving a downstream clearance prior to the transfer of control point.
- (5)Division (5)
- (6)Division (6)