# Commission Implementing Regulation (EU) No 923/2012 of 26 September 2012 laying down the common rules of the air and operational provisions regarding services and procedures in air navigation and amending Implementing Regulation (EU) No 1035/2011 and Regulations (EC) No 1265/2007, (EC) No 1794/2006, (EC) No 730/2006, (EC) No 1033/2006 and (EU) No 255/2010 (Text with EEA relevance), Division (b): ATIS for arriving and departing aircraft

Extent: E+W+S+N.I.

ATIS messages containing both arrival and departure information shall contain the following elements of information in the order listed:
(1)name of aerodrome;
(2)arrival and/or departure indicator;
(3)contract type, if communication is via D-ATIS;
(4)designator;
(5)time of observation, if appropriate;
(6)type of approach(es) to be expected;
(7)the runway(s) in use; status of arresting system constituting a potential hazard, if any;
(8)significant runway surface conditions and, if appropriate, braking action;
(9)holding delay, if appropriate;
(10)transition level, if applicable;
(11)other essential operational information;
(12)surface wind direction (in degrees magnetic) and speed, including significant variations and, if surface wind sensors related specifically to the sections of runway(s) in use are available and the information is required by aircraft operators, the indication of the runway and the section of the runway to which the information refers;
(13)visibility and, when applicable, RVR and, if visibility/RVR sensors related specifically to the sections of runway(s) in use are available and the information is required by operators, the indication of the runway and the section of the runway to which the information refers;
(14)present weather;
(15)cloud below 1 500 m (5 000 ft) or below the highest minimum sector altitude, whichever is greater; cumulonimbus; if the sky is obscured, vertical visibility when available;
(16)air temperature;
(17)dew point temperature;
(18)altimeter setting(s);
(19)any available information on significant meteorological phenomena in the approach and climb-out areas including wind shear, and information on recent weather of operational significance;
(20)trend forecast, when available; and
(21)specific ATIS instructions.

---
Source: https://www.legislation.gov.uk/eur/2012/923/annex/section/9/division/SERA.9010/division/b (the official version)
Page: https://openlegislation.uk/eu-regulation-2012-923/annex/section-9/division-SERA.9010/division-b
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

