Division ARO.OPS.240 Specific approval of RNP AR APCHF1
United Kingdom
- (a)
When compliance with the requirements in SPA.PBN.105 has been demonstrated by the applicant, the F2CAA shall grant a generic specific approval or a procedure-specific approval for RNP AR APCH.
- (b)
In the case of a procedure-specific approval, the CAA shall:
- (1)
list the approved instrument approach procedures at specific aerodromes in the PBN approval;
- (2)
establish coordination with the F3aviation authorities for these aerodromes, if appropriate; and
- (3)
take into account possible credits stemming from RNP AR APCH specific approvals already issued to the applicant.
- (1)
Annotations
Textual amendments
- F1
- F2
Word in Annex 2 point ARO.OPS.240 substituted (31.12.2020) by The Aviation Safety (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/645), regs. 1, 355(13)(a) (with Sch. 3) (as amended by S.I. 2019/1098, regs. 1(3), 12); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Words in Annex 2 point ARO.OPS.240 substituted (31.12.2020) by The Aviation Safety (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/645), regs. 1, 355(13)(b) (with Sch. 3) (as amended by S.I. 2019/1098, regs. 1(3), 12); 2020 c. 1, Sch. 5 para. 1(1)