Division (b) To obtain the approval, the operator shall provide evidence that the following conditions are met:
United Kingdom
- (1)
the AFM contains approved data for the required increase of operating speed and data to allow the construction of the flight path considering the increased bank angles and speeds;
- (2)
visual guidance is available for navigation accuracy;
- (3)
weather minima and wind limitations are specified for each runway; and
- (4)
F1the flight crew has obtained adequate knowledge of the route to be flown and of the procedures to be used in accordance with Subpart FC of Part-ORO.