# Commission Regulation (EU) No 965/2012 of 5 October 2012 laying down technical requirements and administrative procedures related to air operations pursuant to Regulation (EC) No 216/2008 of the European Parliament and of the Council, Division (a): From the end of the TODRH with the critical engine failure recognised at the TDP:

Extent: E+W+S+N.I.

(1)The take-off mass shall be such that the take-off flight path provides a vertical clearance, above all obstacles located in the climb path, of not less than 10,7 m (35 ft) for operations under VFR and 10,7 m (35 ft) + 0,01 × distance DR for operations under IFR. Only obstacles as specified in CAT.POL.H.110 have to be considered.
(2)Where a change of direction of more than 15° is made, adequate allowance shall be made for the effect of bank angle on the ability to comply with the obstacle clearance requirements. This turn is not to be initiated before reaching a height of 61 m (200 ft) above the take-off surface unless it is part of an approved procedure in the AFM.

---
Source: https://www.legislation.gov.uk/eur/2012/965/annex/IV/division/subpart+c/division/section+2/division/chapter+2/division/catpolh210/division/a (the official version)
Page: https://openlegislation.uk/eu-regulation-2012-965/annex-IV/division-subpart+c/division-section+2/division-chapter+2/division-catpolh210/division-a
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

