# Commission Regulation (EU) No 965/2012 of 5 October 2012 laying down technical requirements and administrative procedures related to air operations pursuant to Regulation (EC) No 216/2008 of the European Parliament and of the Council, Division (b): When showing compliance with (a)(2) or (a)(3):

Extent: E+W+S+N.I.

(1)the critical engine is assumed to fail at the most critical point along the route;
(2)account is taken of the effects of winds on the flight path;
(3)fuel jettisoning is planned to take place only to an extent consistent with reaching the aerodrome or operating site with the required fuel reserves and using a safe procedure; and
(4)fuel jettisoning is not planned below 1 000 ft above terrain.

---
Source: https://www.legislation.gov.uk/eur/2012/965/annex/IV/division/subpart+c/division/section+2/division/chapter+2/division/catpolh215/division/b (the official version)
Page: https://openlegislation.uk/eu-regulation-2012-965/annex-IV/division-subpart+c/division-section+2/division-chapter+2/division-catpolh215/division-b
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

