Annex VI GUIDELINES FOR TRANSPARENCY AND PUBLIC PARTICIPATIONF1
United Kingdom Repealed
- (1)The manual of procedures referred to in Article 9(1) shall at least specify:
- (2)The detailed schedule referred to in Article 10(4)(b) shall specify as a minimum the following:
- (3)To increase public participation in the permit granting process and ensure in advance information and dialogue with the public, the following principles shall be applied:
- (4)The concept for public participation shall at least include information about:
- (5)In the context of the public consultation to be carried out before submission of the application file, the relevant parties shall at least:
- (6)The project website shall make available as a minimum the following:
Annotations
Textual amendments
- F1
Regulation revoked (31.12.2020) by The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), reg. 1(1), Sch. 3 para. 8 (with Sch. 4) (as amended by S.I. 2020/1016, regs. 1(2), 3(59)); 2020 c. 1, Sch. 5 para. 1(1)