# Commission Implementing Regulation (EU) No 402/2013 of 30 April 2013 on the common safety method for risk evaluation and assessment and repealing Regulation (EC) No 352/2009 (Text with EEA relevance), Division 1.1.5

Extent: E+W+S+N.I.

Without prejudice to civil liability in accordance with the legal requirements of the United Kingdom, the risk assessment process shall fall within the responsibility of the proposer. In particular the proposer shall decide, with agreement of the actors concerned, who will be in charge of fulfilling the safety requirements resulting from the risk assessment. The safety requirements assigned by the proposer to those actors shall not go beyond the scope of their responsibility and domain of control. This decision shall depend on the type of safety measures selected to control the risks to an acceptable level. The demonstration of compliance with the safety requirements shall be conducted in accordance with point 3.

---
Source: https://www.legislation.gov.uk/eur/2013/402/annex/I/division/1/division/1.1/division/1.1.5 (the official version)
Page: https://openlegislation.uk/eu-regulation-2013-402/annex-I/division-1/division-1.1/division-1.1.5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

