Division 2.4.4
United Kingdom
If the system under assessment deviates from the reference system, the risk evaluation shall demonstrate that the system under assessment reaches at least the same safety level as the reference system, applying another reference system or one of the two other risk acceptance principles. The risks associated with the hazards covered by the reference system shall, in that case, be considered as acceptable.