Annex F1
United Kingdom Repealed
- 1INTRODUCTION
- 2DESCRIPTION OF THE ENERGY SUBSYSTEM
- 3ESSENTIAL REQUIREMENTS
- 4CHARACTERISATION OF THE SUBSYSTEM
- 5INTEROPERABILITY CONSTITUENTS
- 6ASSESSMENT OF CONFORMITY OF THE INTEROPERABILITY CONSTITUENTS AND EC VERIFICATION OF THE SUBSYSTEMS
- 7IMPLEMENTATION OF THE ENERGY TSI
- AConformity assessment of interoperability constituents
- BEC verification of the energy subsystem
- CMean useful voltage
- DSpecification of the pantograph gauge
- EList of referenced standards
- FList of open points
- GGlossary
Annotations
Textual amendments
- F1
Regulation revoked (31.12.2020) by The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), reg. 1(2)(c), Sch. 2