# Commission Regulation (EU) No 1301/2014 of 18 November 2014 on the technical specifications for interoperability relating to the ‘energy’ subsystem of the rail system in the Union (Text with EEA relevance) (revoked), Division 4.2.15.1: General

Extent: E+W+S+N.I.
Status: repealed

(1)The design of phase separation sections shall ensure that trains can move from one section to an adjacent one without bridging the two phases. Power consumption of the train (traction, auxiliaries and no-load current of the transformer) shall be brought to zero before entering the phase separation section. Adequate means (except for the short separation section) shall be provided to allow a train that is stopped within the phase separation section to be restarted.
(2)The overall length D of neutral sections is defined in EN 50367:2012, clause 4. For the calculation of D clearances in accordance to EN 50119:2009, clause 5.1.3 and an uplift of S0 shall be taken into account.

---
Source: https://www.legislation.gov.uk/eur/2014/1301/annex/division/4/division/4.2/division/4.2.15/division/4.2.15.1 (the official version)
Page: https://openlegislation.uk/eu-regulation-2014-1301/annex/division-4/division-4.2/division-4.2.15/division-4.2.15.1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

