# Commission Regulation (EU) No 1301/2014 of 18 November 2014 on the technical specifications for interoperability relating to the ‘energy’ subsystem of the rail system in the Union (Text with EEA relevance) (revoked), Division 4.2.9.2: Maximum lateral deviation

Extent: E+W+S+N.I.
Status: repealed

(1)The maximum lateral deviation of the contact wire in relation to the track centre line under action of a cross wind shall be in accordance to table 4.2.9.2.
(2)In the case of the multi-rail track, the requirement for lateral deviation shall be fulfilled for each pair of rails (designed, to be operated as a separated track) that is intended to be assessed against TSI.
(3)Track gauge system 1 520 mm:
For Member States applying the pantograph profile according to LOC&PAS TSI, point 4.2.8.2.9.2.3 the maximum lateral deviation of the contact wire in relation to the pantograph centre under action of a cross wind shall be 500 mm.

---
Source: https://www.legislation.gov.uk/eur/2014/1301/annex/division/4/division/4.2/division/4.2.9/division/4.2.9.2 (the official version)
Page: https://openlegislation.uk/eu-regulation-2014-1301/annex/division-4/division-4.2/division-4.2.9/division-4.2.9.2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

