Article 11 Technical and organisational requirements and responsibility for reporting data
United Kingdom
In order to ensure efficient, effective and safe exchange and handling of information, the F1national regulatory authority may, after consulting relevant parties, develop technical and organisational requirements for submitting data. The F2national regulatory authority shall consult relevant parties on material updates of these requirements.
The requirements shall:
ensure the security, confidentiality and completeness of information,
enable the identification and correction of errors in data reports,
enable the authentication of the source of information,
ensure business continuity.
F3If the national regulatory authority establishes such requirements, it shall assess whether reporting parties comply with the requirements. Reporting parties who comply with the requirements shall be registered by the F4national regulatory authority. For entities listed under Article 6(4) the requirements listed in the second subparagraph shall be considered as fulfilled.
Persons required to report data referred to in Articles 6, 8 and 9 shall have responsibility for the completeness, accuracy and timely submission of data to F5the national regulatory authority.
Where a person referred to in the first subparagraph reports those data through a third party the person shall not be responsible for failures in the completeness, accuracy or timely submission of the data which are attributable to the third party. In those cases the third party shall be responsible for those failures, without prejudice to Articles 4 and 18 of Regulation (EC) No 543/2013 on submission of data in electricity markets.
Persons referred to in the first subparagraph shall nevertheless take reasonable steps to verify the completeness, accuracy and timeliness of the data which they submit through third parties.
Annotations
Textual amendments
- F1
Words in Art. 11(1) substituted (31.12.2020) by The Electricity and Gas (Market Integrity and Transparency) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/534), reg. 1(2), Sch. 2 para. 13(2)(a)(i); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in Art. 11(1) substituted (31.12.2020) by The Electricity and Gas (Market Integrity and Transparency) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/534), reg. 1(2), Sch. 2 para. 13(2)(a)(ii); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Words in Art. 11(1) substituted (31.12.2020) by The Electricity and Gas (Market Integrity and Transparency) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/534), reg. 1(2), Sch. 2 para. 13(2)(b)(i); 2020 c. 1, Sch. 5 para. 1(1)
- F4
Words in Art. 11(1) substituted (31.12.2020) by The Electricity and Gas (Market Integrity and Transparency) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/534), reg. 1(2), Sch. 2 para. 13(2)(b)(ii); 2020 c. 1, Sch. 5 para. 1(1)
- F5
Words in Art. 11(2) substituted (31.12.2020) by The Electricity and Gas (Market Integrity and Transparency) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/534), reg. 1(2), Sch. 2 para. 13(3); 2020 c. 1, Sch. 5 para. 1(1)