# Commission Implementing Regulation (EU) No 1348/2014 of 17 December 2014 on data reporting implementing Article 8(2) and Article 8(6) of Regulation (EU) No 1227/2011 of the European Parliament and of the Council on wholesale energy market integrity and transparency (Text with EEA relevance), Article 9: Rules for the reporting of fundamental data on gas

Extent: E+W+S+N.I.

1. Gas transmission system operators shall, on behalf of market participants, report information to the national regulatory authority in relation to the capacity and use of facilities for transmission of natural gas including planned and unplanned unavailability of these facilities as referred to in points 3.3(1) and 3.3(5) of Annex I to Regulation (EC) No 715/2009 of the European Parliament and of the Council. ...
Gas transmission system operators shall make the information referred to in the first subparagraph available to the national regulatory authorityas soon as reasonably practicable after they obtain the information.
2. Gas TSOs or third parties on their behalf shall report to the national regulatory authority in accordance with Article 8(5) of Regulation (EU) No 1227/2011 day-ahead nominations and final re-nominations of booked capacities specifying the identity of the market participants involved and the allocated quantities. The information shall be made available no later than the following working day.
The information shall be provided for the following points of the transmission system:
(a) all interconnection points,
(b) entry points of production facilities including of upstream pipelines,
(c) for exit points connected to a single customer,
(d) entry and exit points to and from storage,
(e) for LNG facilities,
(f) for physical and virtual hubs.
3. LNG system operators as defined in Article 2 of the Gas Regulation shall report to the national regulatory authority for each LNG facility the following information:
(a) the technical, contracted and available capacity of the LNG facility in a daily resolution,
(b) send-out and inventory of the LNG facility in a daily resolution,
(c) planned and unplanned unavailability announcements of the LNG facility including the time of the announcement and the capacities concerned.
4. The information referred to in point (a) and (b) of paragraph 3 shall be made available no later than the following working day.
The information including updates of it referred to in point (c) of paragraph 3 shall be made available as soon as that information becomes available.
5. Market participants or LNG System Operators on their behalf shall report to the national regulatory authority for each LNG facility the following information:
(a) in relation to unloading and reloading of cargos:
(i)date of unloading or reloading,
(ii)volumes unloaded or reloaded per ship,
(iii)the name of the terminal customer,
(iv)name and size of the ship using the facility.
(b) the planned unloading or reloading at the LNG facilities in a daily resolution for the next month specifying the market participant and the name of the terminal customer (if different from the market participant).
6. The information referred to in point (a) of paragraph 5 shall be made available no later than the working day following unloading or reloading.
The information referred to in point (b) of paragraph 5 shall be made available in advance of the month to which it relates.
7. Storage system operators as defined in Article 2 of the Gas Regulation shall report to the national regulatory authority for each storage facility or, where facilities operated in groups, for each group of storage facilities following information through a joint platform:
(a) the technical, contracted and available capacity of the storage facility,
(b) amount of gas in stock at the end of the gas day, inflows (injections) and outflows (withdrawals) for each gas day,
(c) planned and unplanned unavailability announcements of the storage facility including the time of the announcement and the capacities concerned.
8. The information referred to in point (a) and (b) of paragraph 7 shall be made available no later than the following working day.
The information including updates of it referred to in point (c) of paragraph 7 shall be made available as soon as the information becomes available.
9. Market participants or Storage System Operators on their behalf shall report to the national regulatory authority the amount of gas the market participant has stored at the end of the gas day. This information shall be made available no later than the following working day.

---
Source: https://www.legislation.gov.uk/eur/2014/1348/article/9 (the official version)
Page: https://openlegislation.uk/eu-regulation-2014-1348/article-9
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.