Division 2.B.4 Result indicators
United Kingdom
Table 10
Programme-specific result indicators (by specific objective)
(Reference: point (c)(ii) of Article 8(2) of Regulation (EU) No 1299/2013)
| The target values can be qualitative or quantitative. | |||||||
| ID | Indicator | Measurement unit | Baseline value | Baseline year | Target valuef2 (2023) | Source of data | Frequency of reporting |
|---|---|---|---|---|---|---|---|
| <2.B.2.1 type=‘S’ maxlength=‘5’ input=‘M’> | <2.B.2.2 type=‘S’ maxlength= ‘255’ input=‘M’> | <2.B.2.3 type=‘S’ input=‘M’> | Quantitative <2.B.2.4 type=‘N’ input=‘M’> | <2.B.2.5 type=‘N’ input=‘M’> | Quantitative <2.B.2.6 type=‘N’ input=‘M’> Qualitative <2A.1.10 type=‘S’ maxlength= ‘100’ input=‘M’> | <2.B.2.7 type=‘S’ maxlength= ‘100’ input=‘M’> | <2.B.2.8 type=‘S’ maxlength= ‘100’ input=‘M’> |
Annotations
Footnotes
- f1
-
Required where objectively justified by the given the content of the actions and where the Union support to technical assistance in the cooperation programme exceeds EUR 15 million.
- f2
-
The target values can be qualitative or quantitative.
Notes on Annex II
Footnotes
- f1
-
Legend:
type decisionN=Number, D=Date, S=String, C=Checkbox, P=Percentage, B=Boolean
inputN=Not part of the Commission decision approving the cooperation programme
M=Manual, S=Selection, G=Generated by system
‘maxlength’= Maximum number of characters including spaces.