# Commission Regulation (EU) No 312/2014 of 26 March 2014 establishing a Network Code on Gas Balancing of Transmission Networks (Text with EEA relevance), Article 18: Nomination and re-nomination procedure at points other than interconnection points

Extent: E+W+S+N.I.

1. The national regulatory authority shall, if not determined already, after consultation of the transmission system operator, determine at which points other than interconnection points nominations and re-nominations are required.
2. Where nominations and re-nominations are required at points other than interconnection points the following principles shall apply:
(a) network users shall be entitled to submit re-nominations for the gas day;
(b) the transmission system operator shall confirm or reject the submitted nominations and re-nominations considering the timelines referred to in Article 17.

---
Source: https://www.legislation.gov.uk/eur/2014/312/article/18 (the official version)
Page: https://openlegislation.uk/eu-regulation-2014-312/article-18
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.