Article 25 Types of within day obligations
United Kingdom
There are three types of within day obligations, each incentivising the network user for a specific objective as set out in this Article:
- (1)
System-wide within day obligation
shall be designed to provide incentives for network users to keep the transmission network within its operational limits and shall set out the following:
- (a)
the operational limits of the transmission network within which it has to remain;
- (b)
the actions the network users can undertake to keep the transmission network within the operational limits;
- (c)
the consequential balancing actions of the transmission system operator when the operational limits of the transmission network are approached or reached;
- (d)
the attribution of costs and/or revenues to the network users and/or consequences on the within day position of these network users resulting from balancing actions undertaken by the transmission system operator;
- (e)
the related charge which shall be based on the individual within day position of the network user.
- (a)
- (2)
Balancing portfolio within day obligation
shall be designed to incentivise network users to keep their individual position during the gas day within a pre-defined range and shall set out the following:
- (a)
for each balancing portfolio the range within which this balancing portfolio has to stay;
- (b)
how the range referred to above is determined;
- (c)
the consequences for network users not staying within the defined range and, where appropriate, details of how any corresponding charge is derived;
- (d)
the related charge which shall be based on the individual within day position of the network user.
- (a)
- (3)
Entry-exit point within day obligation
shall be designed to provide incentives for network users to limit the gas flow or the gas flow variation under specific conditions at specific entry-exit points and shall set out the following:
- (a)
the limits in the gas flow and/or the gas flow variation;
- (b)
the entry and/or exit point or groups of entry and/or exit points to which such limits apply;
- (c)
the conditions under which such limits shall apply;
- (d)
the consequences of not complying with such limits.
- (a)
This obligation is additional to any other agreements with final costumers containing, amongst other things, localised specific restrictions and obligations regarding the physical gas flow.