Article 1 Subject matter

United Kingdom

Original text. Later amendments are not shown.

1.

This Regulation establishes a network code which lays down the requirements for grid connection of:

(a)

transmission-connected demand facilities;

(b)

transmission-connected distribution facilities;

(c)

distribution systems, including closed distribution systems;

(d)

demand units, used by a demand facility or a closed distribution system to provide demand response services to relevant system operators and relevant TSOs.

2.

This Regulation, therefore, helps to ensure fair conditions of competition in F1electricity markets, to ensure system security and the integration of renewable electricity sources, and to facilitate F2... trade in electricity.

3.

This Regulation also lays down the obligations for ensuring that system operators make appropriate use of the demand facilities' and distribution systems' capabilities in a transparent and non-discriminatory manner F3....

Annotations

Textual amendments

F1

Words in Art. 1(2) substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 2 para. 1(2)(a)

F2

Word in Art. 1(2) omitted (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 2 para. 1(2)(b)

F3

Words in Art. 1(3) omitted (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 2 para. 1(3)