# Commission Regulation (EU) 2016/1388 of 17 August 2016 establishing a Network Code on Demand Connection (Text with EEA relevance), Article 30: Specific provisions for demand units with demand response very fast active power control

Extent: E+W+S+N.I.

1. The relevant TSO in coordination with the relevant system operator may agree with a demand facility owner or a CDSO (including, but not restricted to, through a third party) on a contract for the delivery of demand response very fast active power control.
2. If the agreement referred to in paragraph 1 takes place, the contract referred to in paragraph 1 shall specify:
(a) a change of active power related to a measure such as the rate-of-change-of-frequency for that portion of its demand;
(b) the operating principle of this control system and the associated performance parameters;
(c) the response time for very fast active power control, which shall not be longer than 2 seconds.

---
Source: https://www.legislation.gov.uk/eur/2016/1388/article/30 (the official version)
Page: https://openlegislation.uk/eu-regulation-2016-1388/article-30
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.