  "legislation_title": "Commission Regulation (EU) 2016/1447 of 26 August 2016 establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (Text with EEA relevance)",
  "legislation_url": "https://openlegislation.uk/eu-regulation-2016-1447",
  "path": "annex/VII",
  "kind": "annex",
  "number": "VII",
  "heading": "Voltage ranges and time periods referred to in Article 40",
  "text": "Voltage Range\nTime period for operation\n0.85 pu-0.90 pu\n60 minutes\n0.90 pu-1.10 pu\nUnlimited\n1.10 pu-1.118 pu\nUnlimited, unless specified otherwise by the relevant system operator, in coordination with the relevant TSO.\n1.118 pu-1.15 pu\nTo be specified by the relevant system operator, in coordination with the relevant TSO.\nTable 9: Minimum time periods for which a DC-connected power park module shall be capable of operating for different voltages deviating from a reference 1 pu value without disconnecting from the network where the voltage base for pu values is from 110 kV to (not including) 300 kV.\nVoltage Range\nTime period for operation\n0.85 pu-0.90 pu\n60 minutes\n0.90 pu-1.05 pu\nUnlimited\n1.05 pu-1.15 pu\nTo be specified by the relevant system operator, in coordination with the relevant TSO. Various sub-ranges of voltage withstand capability can be specified.\nTable 10: Minimum time periods for which a DC-connected power park module shall be capable of operating for different voltages deviating from a reference 1 pu value without disconnecting from the network where the voltage base for pu values is from 300 kV to 400 kV (included).\nFigure 7: U-Q/Pmax-profile of a DC-connected power park module at the connection point. The diagram represents boundaries of a U-Q/Pmax-profile of the voltage at the connection point[s], expressed by the ratio of its actual value to its reference 1 pu value in per unit, against the ratio of the reactive power (Q) to the maximum capacity (Pmax). The position, size and shape of the inner envelope are indicative and other than rectangular may be used within the inner envelope. For profile shapes other than rectangular, the voltage range represents the highest and lowest voltage points. Such a profile would not give rise to the full reactive power range being available across the range of steady-state voltages.\nRange of width of Q/Pmax profile\nRange of steady-state Voltage level in pu\n0-0.95\n0.1-0.225\nTable 11: Maximum and minimum range of both Q/Pmax and steady-state voltage for a DC-connected PPM",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Word in Annex 7 Table 9 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(2)(a)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Word in Annex 7 Table 9 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(2)(b)"
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Word in Annex 7 Table 9 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(2)(c)"
    },
    {
      "type": "F",
      "label": "F4",
      "text": "Word in Annex 7 Table 9 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(2)(d)"
    },
    {
      "type": "F",
      "label": "F5",
      "text": "Word in Annex 7 Table 9 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(2)(e)"
    },
    {
      "type": "F",
      "label": "F6",
      "text": "Word in Annex 7 Table 10 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(3)(a)"
    },
    {
      "type": "F",
      "label": "F7",
      "text": "Word in Annex 7 Table 10 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(3)(b)"
    },
    {
      "type": "F",
      "label": "F8",
      "text": "Word in Annex 7 Table 10 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(3)(c)"
    },
    {
      "type": "F",
      "label": "F9",
      "text": "Word in Annex 7 Table 10 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(3)(d)"
    },
    {
      "type": "F",
      "label": "F10",
      "text": "Annex 7 Figure 7: decimal point substituted for comma in each value in scales for X- and Y-axis of graph (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para 40(4)"
    },
    {
      "type": "F",
      "label": "F11",
      "text": "Word in Annex 7 Table 11 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(5)(a)"
    },
    {
      "type": "F",
      "label": "F12",
      "text": "Word in Annex 7 Table 11 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(5)(b)"
    },
    {
      "type": "F",
      "label": "F13",
      "text": "Word in Annex 7 Table 11 substituted (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 3 para. 40(5)(c)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eur/2016/1447/annex/VII",
    "retrieved_at": "2026-11-01T14:45:35.996013+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}