# Commission Regulation (EU) 2016/1447 of 26 August 2016 establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (Text with EEA relevance), Article 1: Subject matter

Extent: E+W+S+N.I.

This Regulation establishes a network code which lays down the requirements for grid connections of high-voltage direct current (HVDC) systems and DC-connected power park modules. It, therefore, helps to ensure fair conditions of competition in electricity markets, to ensure system security and the integration of renewable electricity sources, and to facilitate ... trade in electricity.
This regulation also lays down the obligations for ensuring that system operators make appropriate use of HVDC systems and DC-connected power park modules capabilities in a transparent and non-discriminatory manner ....

---
Source: https://www.legislation.gov.uk/eur/2016/1447/article/1 (the official version)
Page: https://openlegislation.uk/eu-regulation-2016-1447/article-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

