  "url": "https://openlegislation.uk/eu-regulation-2016-1447/article-28",
  "json_url": "https://openlegislation.uk/eu-regulation-2016-1447/article-28.json",
  "legislation": "eur/2016/1447",
  "legislation_title": "Commission Regulation (EU) 2016/1447 of 26 August 2016 establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (Text with EEA relevance)",
  "legislation_url": "https://openlegislation.uk/eu-regulation-2016-1447",
  "path": "article/28",
  "kind": "article",
  "number": "28",
  "heading": "Energisation and synchronisation of HVDC converter stations",
  "text": "Unless otherwise instructed by the relevant system operator, during the energisation or synchronisation of an HVDC converter station to the AC network or during the connection of an energised HVDC converter station to an HVDC system, the HVDC converter station shall have the capability to limit any voltage changes to a steady-state level specified by the relevant system operator in coordination with the relevant TSO. The level specified shall not exceed 5 per cent of the pre-synchronisation voltage. The relevant system operator, in coordination with the relevant TSO, shall specify the maximum magnitude, duration and measurement window of the voltage transients.",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eur/2016/1447/article/28",
    "retrieved_at": "2026-11-01T14:45:35.996013+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}