# Commission Regulation (EU) 2016/1447 of 26 August 2016 establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (Text with EEA relevance), Article 84: Amendment of contracts and general terms and conditions

Extent: E+W+S+N.I.

1. The regulatory authority shall ensure that all relevant clauses in contracts and general terms and conditions relating to the grid connection of new HVDC systems or new DC-connected power park modules are brought into compliance with the requirements of this Regulation.
2. All relevant clauses in contracts and relevant clauses of general terms and conditions relating to the grid connection of existing HVDC systems or existing DC-connected power park modules subject to all or some of the requirements of this Regulation in accordance with paragraph 1 of Article 4 shall be amended in order to comply with the requirements of this Regulation. The relevant clauses shall be amended within three years following the decision of the regulatory authority ... as referred to in Article 4(1).
3. The regulatory authority shall ensure that ... agreements between system operators and owners of new or existing HVDC systems and DC-connected power park modules subject to this Regulation and relating to grid connection requirements for HVDC systems and DC-connected power park modules, in particular in industry codes, reflect the requirements set out in this Regulation.

---
Source: https://www.legislation.gov.uk/eur/2016/1447/article/84 (the official version)
Page: https://openlegislation.uk/eu-regulation-2016-1447/article-84
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.