OpenLegislation

Article 12 Verification plan

United Kingdom

Original text. Later amendments are not shown.

The verifier shall draft a verification plan commensurate with the information obtained and the risks identified during the risk assessment. The verification plan shall include at least:

  1. (a)

    a verification programme describing the nature and scope of the verification activities and the time and manner in which they are to be carried out;

  2. (b)

    a data sampling plan setting out the scope and methods of data sampling relating to data points underlying the aggregated CO2 emissions, fuel consumption or other relevant information in the emissions report.