OpenLegislation

Division 5.3 If a lot is accepted, all the subsystems or safety components of the lot shall be considered approved, except for those subsystems or safety components from the sample that have been found not to satisfy the tests.

United Kingdom

Original text. Later amendments are not shown.

F1The approved body shall issue a certificate of conformity in respect to the examinations and tests carried out, and shall affix its identification number to each approved subsystem or safety component or have it affixed under its responsibility.

The manufacturer shall keep the certificates of conformity at the disposal of the F2Secretary of State for 30 years after the subsystem or the safety component has been placed on the market.

Annotations

Textual amendments

F1

Words in Annex 5 Point 5.3 substituted (31.12.2020) by The Cableway Installations (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/1347), regs. 1, 55(e)(ii)(aa); 2020 c. 1, Sch. 5 para. 1(1)

F2

Words in Annex 5 Point 5.3 substituted (31.12.2020) by The Cableway Installations (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/1347), regs. 1, 55(e)(ii)(bb); 2020 c. 1, Sch. 5 para. 1(1)