Division 3.1 The manufacturer shall lodge an application for unit verification of a subsystem or a safety component with the approved body of his choice.F1
United Kingdom
The application shall include:
- (a)
the name and address of the manufacturer and, if the application is lodged by the authorised representative, his name and address as well;
- (b)
a written declaration that the same application has not been lodged with any F2other approved body;
- (c)
the technical documentation for the subsystem or the safety component according to Annex VIII;
- (d)
details of the premises where the subsystem or the safety component can be examined.
Annotations
Textual amendments
- F1
Words in Annex 6 Point 3.1 substituted (31.12.2020) by The Cableway Installations (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/1347), regs. 1, 56(a)(i)(aa); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in Annex 6 Point 3.1 substituted (31.12.2020) by The Cableway Installations (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/1347), regs. 1, 56(a)(i)(bb); 2020 c. 1, Sch. 5 para. 1(1)