OpenLegislation

Division 3.5

United Kingdom

Original text. Later amendments are not shown.

The manufacturer shall keep F1the approved body that has approved the quality system informed of any intended change to the quality system.

F2The approved body shall evaluate any proposed changes and decide whether the modified quality system will continue to satisfy the requirements referred to in point 3.2 or whether a reassessment is necessary.

It shall notify the manufacturer or the authorised representative of its decision. The notification shall contain the conclusions of the assessment and the reasoned assessment decision.

Annotations

Textual amendments

F1

Words in Annex 7 Point 3.5 substituted (31.12.2020) by The Cableway Installations (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/1347), regs. 1, 57(d)(i); 2020 c. 1, Sch. 5 para. 1(1)

F2

Words in Annex 7 Point 3.5 substituted (31.12.2020) by The Cableway Installations (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/1347), regs. 1, 57(d)(ii); 2020 c. 1, Sch. 5 para. 1(1)