# Commission Regulation (EU) 2017/1151 of 1 June 2017 supplementing Regulation (EC) No 715/2007 of the European Parliament and of the Council on type-approval of motor vehicles with respect to emissions from light passenger and commercial vehicles (Euro 5 and Euro 6) and on access to vehicle repair and maintenance information, amending Directive 2007/46/EC of the European Parliament and of the Council, Commission Regulation (EC) No 692/2008 and Commission Regulation (EU) No 1230/2012 and repealing Commission Regulation (EC) No 692/2008 (Text with EEA relevance), Division 4.3.2.4.3: Although it is recommended that each coastdown run be performed without interruption, split runs may be performed if data cannot be collected in a single run for all the reference speed points. For split runs, the following additional requirements shall apply:


(a)Care shall be taken to keep the vehicle condition as constant as possible at each split point;
(b)At least one speed point shall be overlapped with the higher speed range coastdown;
(c)At each of all overlapped speed point(s), the average force of the lower speed range coastdown shall not deviate from the average force of the higher speed range coastdown by ± 10 N or ± 5 percent, whichever is greater;
(d)If the track length does not allow fulfilling the requirement in point (b), one additional speed point shall be added to serve as overlapping speed point.

---
Source: https://www.legislation.gov.uk/eur/2017/1151/annex/Sub/4/division/division/4./division/4.3./division/4.3.2./division/4.3.2.4./division/4.3.2.4.3. (the official version)
Page: https://openlegislation.uk/eu-regulation-2017-1151/annex-Sub/4/division/division-4./division-4.3./division-4.3.2./division-4.3.2.4./division-4.3.2.4.3.
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

