# Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (Text with EEA relevance), Article 106: Control area adequacy ...

Extent: E+W+S+N.I.

1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2. Twice a year, each TSO shall perform a control area adequacy analysis for the following summer and winter respectively ...
3. Each TSO shall update its control area adequacy analyses if it detects any probable changes to the availability status of power generating modules, load estimations, renewable energy sources estimations or cross zonal capacities that could significantly affect the expected adequacy.

---
Source: https://www.legislation.gov.uk/eur/2017/1485/article/106 (the official version)
Page: https://openlegislation.uk/eu-regulation-2017-1485/article-106
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

