# Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (Text with EEA relevance), Article 135: Information on load and generation behaviour

Extent: E+W+S+N.I.

In accordance with Article 40, each connecting TSO shall have the right to request the information necessary from SGUs to monitor the load and generation behaviour related to imbalances. That information may include:
(a)the time-stamped active power setpoint for real-time and future operation; and
(b)the time-stamped total active power output.

---
Source: https://www.legislation.gov.uk/eur/2017/1485/article/135 (the official version)
Page: https://openlegislation.uk/eu-regulation-2017-1485/article-135
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

