  "url": "https://openlegislation.uk/eu-regulation-2017-1485/article-5",
  "json_url": "https://openlegislation.uk/eu-regulation-2017-1485/article-5.json",
  "legislation": "eur/2017/1485",
  "legislation_title": "Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (Text with EEA relevance)",
  "legislation_url": "https://openlegislation.uk/eu-regulation-2017-1485",
  "path": "article/5",
  "kind": "article",
  "number": "5",
  "heading": "Terms and conditions or methodologies of TSOs",
  "text": "1. TSOs shall develop the terms and conditions or methodologies required by this Regulation and submit them for approval to the regulatory authority in accordance with Article 6(3) and (4) within the respective deadlines set out in this Regulation.\n2. Where a proposal for terms and conditions or methodologies pursuant to this Regulation needs to be developed and agreed by more than one TSO, the participating TSOs shall closely cooperate. TSOs shall regularly inform the regulatory authority about the progress of developing those terms and conditions or methodologies.\n3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .\n4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .\n5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .\n6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .\n7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .\n8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .\n9. Where TSOs fail to submit a proposal for terms and conditions or methodologies to the regulatory authority in accordance with Article 6(3) and (4) within the deadlines specified in this Regulation, they shall provide the regulatory authority with the relevant drafts of the terms and conditions or methodologies, and explain why an agreement has not been reached. ... The regulatory authority shall take the appropriate steps to make possible the adoption of the required terms and conditions or methodologies within 4 months from the receipt of the relevant drafts.",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Art. 5(1) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(2) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in Art. 5(2) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(3) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)"
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Art. 5(3)-(8) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(4) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)"
    },
    {
      "type": "F",
      "label": "F4",
      "text": "Words in Art. 5(9) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(5)(a) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)"
    },
    {
      "type": "F",
      "label": "F5",
      "text": "Words in Art. 5(9) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(5)(b) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)"
    },
    {
      "type": "F",
      "label": "F6",
      "text": "Words in Art. 5(9) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(5)(c)(i) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)"
    },
    {
      "type": "F",
      "label": "F7",
      "text": "Words in Art. 5(9) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(5)(c)(ii) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eur/2017/1485/article/5",
    "retrieved_at": "2026-11-01T14:44:42.168103+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}