{
  "url": "https://openlegislation.uk/eu-regulation-2017-1485/article-53",
  "json_url": "https://openlegislation.uk/eu-regulation-2017-1485/article-53.json",
  "legislation": "eur/2017/1485",
  "legislation_title": "Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (Text with EEA relevance)",
  "legislation_url": "https://openlegislation.uk/eu-regulation-2017-1485",
  "path": "article/53",
  "kind": "article",
  "number": "53",
  "heading": "Data exchange between TSOs and distribution-connected demand facilities or third parties participating in demand response",
  "text": "1. Unless otherwise provided by the TSO, each SGU which is a distribution-connected demand facility and which participates in demand response other than through a third party shall provide the following scheduled and real-time data to the TSO and to the DSO:\n(a) structural minimum and maximum active power available for demand response and the maximum and minimum duration of any potential usage of this power for demand response;\n(b) a forecast of unrestricted active power available for demand response and any planned demand response;\n(c) real-time active and reactive power at the connection point; and\n(d) a confirmation that the estimations of the actual values of demand response are applied.\n2. Unless otherwise provided by the TSO, each SGU which is a third party participating in demand response as defined in Article 27 of Regulation (EU) 2016/1388, shall provide the TSO and the DSO at the day-ahead and close to real-time and on behalf of all of its distribution-connected demand facilities, with the following data:\n(a) structural minimum and maximum active power available for demand response and the maximum and minimum duration of any potential activation of demand response in a specific geographical area defined by the TSO and DSO;\n(b) a forecast of unrestricted active power available for the demand response and any planned level of demand response in a specific geographical area defined by the TSO and DSO;\n(c) real-time active and reactive power; and\n(d) a confirmation that the estimations of the actual values of demand response are applied.",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eur/2017/1485/article/53",
    "retrieved_at": "2026-11-01T14:44:42.168103+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}