Division 3.2 ...F1
United Kingdom
- (a)
N – 1 formula
- (i)
the identification of the single largest gas infrastructure;
- (ii)
the calculation of the N – 1 formula F2...;
- (iii)
a description of the values used for all elements in the N – 1 formula, including intermediate values used for the calculation (e.g. for EPm indicate the capacity of all entry points considered under this parameter);
- (iv)
an indication of the methodologies used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations);
- (v)
if so decided by the F3Secretary of State, calculation of the N – 1 formula using demand-side measures:
the calculation of the N – 1 formula in accordance with point 2 of Annex II,
a description of the values used for all elements in the N – 1 formula, including intermediate figures used for the calculation (if different to the figures described under point 3(a)(iii) of this Annex),
an indication of the methodologies used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations),
an explanation of the market-based demand-side measures adopted/to be adopted to compensate a disruption of gas supply and its expected impact (Deff);
- (vi)
F4...
- (i)
- (b)
bi-directional capacity
- (i)
indicate the interconnection points equipped with bidirectional capacity and the maximal capacity of bi-directional flows;
- (ii)
indicate the arrangements governing the use of the reverse flow capacity (e.g. interruptible capacity);
- (iii)
indicate interconnection points where an exemption has been granted in accordance with Article 5(4), the duration of the exemption and the grounds on which it was granted.
- (i)
Annotations
Textual amendments
- F1
Words in Annex 6 point 3.2 omitted (31.12.2020) by virtue of The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 1 para. 23(5)(b)(i); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in Annex 6 point 3.2 omitted (31.12.2020) by virtue of The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 1 para. 23(5)(b)(ii); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Words in Annex 6 point 3.2 substituted (31.12.2020) by The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 1 para. 23(5)(b)(iii); 2020 c. 1, Sch. 5 para. 1(1)
- F4
Annex 6 point 3.2(a)(vi) omitted (31.12.2020) by virtue of The Gas (Security of Supply and Network Codes) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/531), reg. 1(2), Sch. 1 para. 23(5)(b)(iv); 2020 c. 1, Sch. 5 para. 1(1)