Annex I
United Kingdom
‘ANNEX 1
Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Sweden
1.
Definition of standard scales of unit costs
The amounts of standard scales of unit costs apply only to the parts of operations that cover the categories of costs set out in this Annex.
The total number of hours declared in a year must not be higher than the standard number of annual hours worked in Sweden, which is equal to 1 862 hours.
Professional code applicable in Sweden.
Currency in Sweden.
Type of operationsf1 Indicator name Category of costs Measurement unit for the indicator Amounts 1.
Operations supported under priority axis 1 ‘Supply of skills’ of the Operational Programme (Nationellt socialfondsprogram för investering för tillväxt och sysselsättning 2014-2020) (CCI- 2014SE05M9OP001)
Hours worked All categories of costs except wages for participants. Number of hours workedf2 Wage group (SSYK codef3) Region: Stockholm (SE 11) (unit cost per hour — amount in SEKf4) All regions except Stockholm (SE 12-33) (unit cost per hour — amount in SEK) 1 (912 – 913 -919 -921) 321 328 2 (414 – 415 – 421 – 422 -512 – 513 – 514 – 515 – 522 – 611 -612 -613 – 614 -826) 360 356 3 (331 – 348 – 411 – 412 – 413 – 419 – 711 – 712 – 713 – 714 – 721 – 722 – 723 – 724 – 731 – 732 – 734 – 741 – 742 – 743 – 811 – 812 – 813 – 814 – 815 – 816 – 817 – 821 – 822 – 823 -824 – 825 – 827 -828 -829 -831 – 832 – 833 – 834 – 914 – 915 – 931 – 932 – 933) 416 395 4 (223 – 232 – 233 – 234 – 235 – 243 – 249 – 313 – 322 – 323 – 324 – 332 – 342 – 343 – 344 – 345 – 346 – 347 – 511 – 011) 473 438 5 (213 – 221 – 231 – 241 – 244 – 245 – 246 – 247 – 248 – 311 – 312 – 315 – 321 – 341) 587 512 6 (211 – 212 – 214 – 222 – 242 – 314) 776 724 7 A (121) 1 035 1 035 7 B (111-123) 1 121 875 7 C (131-122) 735 601 2.
Operations supported under priority axis 1 ‘Supply of skills’ of the Operational Programme (Nationellt socialfondsprogram för investering för tillväxt och sysselsättning 2014-2020) (CCI-2014SE05M9OP001)
Hours participated in the operation Participant's wage Number of hours participated Region: Stockholm (SE 11) (unit cost per hour — amount in SEK) All regions except Stockholm (SE 12-33) (unit cost per hour — amount in SEK) 229 234 3.
Operations supported under priority axis 2 ‘Increased transition to work’ and priority axis 3 ‘Youth Employment Initiative’ of Operational Programme (Nationellt socialfondsprogram för investering för tillväxt och sysselsättning 2014-2020) (CCI-2014SE05M9OP001)
Hours worked All categories of costs except allowances for participants. Number of hours worked Occupational category Region: Stockholm (SE 11) (unit cost per hour — amount in SEK) All regions except Stockholm (SE 12-33) (unit cost per hour — amount in SEK) Project leader for operations where the total eligible expenditure as stated in the document setting out the conditions for support is above 20 million in SEK) 535 435 Project leader for operations where the total eligible expenditure as stated in the document setting out the conditions for support is below or equal to 20 million in SEK) / assistant project leader for operations where the total eligible expenditure as stated in the document setting out the conditions for support is above 20 million in SEK) 478 405 Project worker 331 300 Project economist 427 363 Administrator 297 270 4.
Operations supported under priority axis 2 ‘Increased transition to work’ and priority axis 3 ‘Youth Employment Initiative’ of Operational Programme (Nationellt socialfondsprogram för investering för tillväxt och sysselsättning 2014-2020) (CCI- 2014SE05M9OP001)
Hours participated in the operation Participant's allowance Number of hours participated Financial assistance (unit cost per hour) Age (SEK) 18-24 years 32 25-29 years 40 30-64 years 46 Activity grant and development allowance (unit cost per hour) Age (SEK) 15-19 years 17 20-24 years 33 25-29 years 51 30-44 years 55 45-69 years 68 Social security and sickness benefit (unit cost per hour) Age (SEK) 19-29 years (social security benefit) 51 30-64 years (sickness benefit) 58 Sickness benefit, rehabilitation benefit, and work and professional injury benefit (unit cost per hour) Age (SEK) – 19 years 48 20-64 years 68 2.
Adjustment of amounts
The unit costs in the table apply to the hours worked or participated in 2015. Except for the unit costs relating to participant's allowances, referred to in point 4 of the table, which will not be adjusted, these values will be increased automatically on the 1st of January each year as from 2016 until 2023 by 2 %.’
‘ANNEX III
Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to the Czech Republic
1.
Definition of standard scales of unit costs
In each case listed below, the categories of costs mentioned cover all costs associated with that operation, except for types of operations 1 and 2, which may also include other categories of costs.
Meaning a new place which is included in the capacity of the new childcare facility as recorded by national regulations, and which has proof of equipment for each new place provided.
A children's group means it has been registered as a children's group pursuant to national legislation on the provision of childcare services in a children's group.
Meaning a place in an existing facility which is newly registered as a children's group in accordance with national legislation and inlcuded in the official capacity of that group, and which has proof of equipment for each place.
The occupancy rate is defined as the number of children attending the childcare facility per half day during 6 months divided by the maximum capacity of the facility per half day during 6 months, multiplied by 100.
This amount will be paid for each 1 % point of occupancy per place up to a maximum of 75 % points for a period of 6 months. If the occupancy rate is less than 20 % there will be no reimbursement.
i.e. provided by an internal trainer.
Tandem lesson is to be understood as two pedagogues cooperating to mutually strengthen their professional development by jointly planning, implementing and reflecting on teaching methods in a class.
Type of operations Indicator name Category of costsf5 Measurement unit for the indicator Amounts(in national currency CZK) 1.
Establishment of a new childcare facility under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
Newly created place in a new childcare facility
purchase of equipment for a childcare facility;
management of project phase focused on creating the facility.
Number of newly created places in a new childcare facilityf6 20 053 incl. VAT, or 16 992 excl. VAT 2.
Transformation of an existing facility to a children's group under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
Transformed place in a children's groupf7
purchase of equipment for a transformed facility;
purchase of teaching aids;
management of project phase focused on transforming the facility
Number of transformed places in a children's groupf8 9 518 incl. VAT, or 8 279 excl. VAT 3.
Operating a childcare facility under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
Occupancy per place in a childcare facility
salaries of teaching and non-teaching staff,
operation of the childcare facility,
management of the operation
Occupancy ratef9 628f10 4.
Upskilling of caregivers under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
Achievement of a qualification as caregiver in a childcare facility
training and examination for professional qualification
Number of persons who obtain a certification of professional qualification as caregiver in a childcare facility 14 178 5.
Lease of premises for childcare facilities under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001) and Priority Axis 4 of Operational Programme Prague Growth Pole (2014CZ16M2OP001)
Occupancy per place in a childcare facility
Rent of the premises for a childcare facility
Occupancy rate. 56 6.
Further external professional training of employees under Priority Axis 1 of Operational Programme Employment, (2014CZ05M9OP001)
One hour (60 minutes) of participation of an employee in an external training course on general information technologies (IT) All eligible costs, including:
Direct costs of providing training;
Indirect costs;
Wages for participants.
Number of completed hours per employee. 324 7.
Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001)
One hour (60 minutes) of participation of an employee in an external training course on soft and managerial skills All eligible costs, including:
Direct costs of providing training;
Indirect costs;
Wages for participants.
Number of completed hours per employee. 593 8.
Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001)
A period (45 minutes) of participation of an employee in external language training courses All eligible costs, including:
Direct costs of providing training;
Indirect costs;
Wages for participants.
Number of completed periods per employee 173 9.
Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001)
One hour (60 minutes) of participation of an employee in a training course in specialised IT All eligible costs, inlcuding:
Direct costs of providing training;
Indirect costs;
Wages for participants.
Number of completed hours per employee 609 10.
Further external professional training of employees under Priority Axis 1 of the Operational Programme Employment (2014CZ05M9OP001)
One hour (60 minutes) of participation of an employee in an external training course in accountancy, economy and law All eligible costs, including:
Direct costs of providing training;
Indirect costs;
Wages for participants.
Number of completed hours per employee 436 11.
Further external professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001)
One hour (60 minutes) of participation of an employee in external technical and other professional training All eligible costs, including:
Direct costs of providing training;
Indirect costs;
Wages for participants.
Number of completed hours per employee 252 12.
Further internalf11 professional training of employees under Priority Axis 1 of Operational Programme Employment (2014CZ05M9OP001)
One hour (60 minutes) of participation of an employee in a training course provided by an internal trainer in any of the following areas:
general information technologies (IT);
soft and managerial skills;
languages;
specialised IT;
accountancy, economy and law;
technical and other professional.
All eligible costs, including:
Direct staff costs;
Indirect costs;
Wages for participants.
Number of completed hours per employee 144 13.
Support provided by non-permanent personnel to school/ educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
0,1 full-time equivalent (FTE) worked as a school psychologist and/or a specialised school pedagogue per month All eligible costs, including, direct staff costs Number of 0,1 FTE worked per month 5 607 14.
Support provided by non-permanent personnel to school/ educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
0,1 FTE worked by a school assistant and/or social pedagogue per month. All eligible costs, including direct staff costs Number of 0,1 FTE worked per month School assistant: 3 502
Social pedagogue: 4 695
15.
Support provided by non-permanent personnel to school/ educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
0,1 FTE worked by a nanny per month All eligible costs, including direct staff costs. Number of 0,1 FTE worked per month 3 227 16.
Provision of extracurricular activity for children/pupils at risk of school failure under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Provision of a block of 16 lessons of extracurricular activities with a duration of 90 minutes per lesson provided to a group of at least 6 children/pupils of which 2 are at risk of school failure. All eligible costs, including direct staff costs. Number of completed blocks of 16 lessons with a duration of 90 minutes per lesson provided to a group of at least 6 children/pupils of which 2 are at risk of school failure. 17 277 17.
Supporting pupils at the risk of school failure through tutoring under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Provision of a block of 16 hours of tutoring to a group of at least 3 registered pupils at risk of school failure. All eligible costs, including direct staff costs. Number of completed blocks of 16 hours provided to a goup of at least 3 registered pupils at risk of school failure. 8 523 18.
Professional development of pedagogues through structured training courses under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Hours of professional training provided to pedagogues. All eligible costs, including direct costs of providing training. Number of completed hours of training per pedagogue
- (1)
422 for training inside regular class time
- (2)
170 for training outside regular class time
19.
Provision of information to parents through meetings under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Thematic meeting with a minimum of eight parents for a minimum duration of two hours (120 minutes). All eligible costs, including direct staff costs. Number of thematic meetings with a minimum of eight parents for a minimum duration of two hours (120 minutes) 3 676 20.
Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Block of 30 hours of external mentoring/ coaching to a group of between 3 and 8 pedagogues. All eligible costs, including direct staff costs. Number of completed blocks of 30 hours mentoring/coaching to a group of between 3 and 8 pedagogues. 29 698 21.
Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Training cycle of 15 hours of structured job-shadowing by a pedagogue All eligible costs, including direct staff costs. Number of completed training cycles of 15 hours per pedagogue undertaking a structured visit to another pedagogue in another school. 4 246 22.
Professional development of pedagogues in schools and educational facilities under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Cycle of 10 hours of training through mutual cooperation involving a group of at least 3 pedagogues. All eligible costs, including direct staff costs. Number of completed training cycles of 10 hours involving a group of at least 3 pedagogues. 8 068 23.
Professional development of teaching staff of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Tandem lessonf12 of 2,75 hours. All eligible costs, including direct staff costs.: Number of completed tandem lessons 778 24.
Professional development of pedagogues of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Cycle of 19 hours of mutual cooperation and learning involving an expert and 2 pedagogues. All eligible costs, including direct staff costs. Number of completed cycles of 19 hours involving an expert and 2 other pedagogues. 5 377 25.
Career advice services in schools and cooperation between schools and employers under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
0,1 FTE worked per month by a career advisor and/or a coordinator of cooperation between a school and employers. All eligible costs, including direct staff costs Number of 0,1 FTE worked per month 4 942 26.
Professional development of pedagogues of school/educational facility under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Training cycle of 8,5 hours involving structured job-shadowing by a pedagogue and a mentor. All eligible costs, including direct staff costs Number of completed training cycles of 8,5 hours per structured visit to an institution/company/facility. 2 395 27.
Professional competence development of pedagogues under Priority axis 3 of Operational Programme Research, Development and Education (2014CZ05M2OP001)
Cycle of 3,75 hours of training involving a pedagogue and expert/ICT technician. All eligible costs, including direct staff costs Number of completed training cycles of 3,75 hours involving a pedagogue and expert/ICT technician. 1 050 2.
Adjustments of amounts.
The rate for unit costs 6-11 may be adjusted by replacing the initial minimum wage rate in the calculation method that consists of the minimum wage, the cost for provision of training and indirect costs.
The rate for unit cost 12 may be adjusted by replacing the initial direct staff costs, including social security and health contributions, and/or the wages for participants, including social security and health contributions in the calculation method that consists of direct staff costs, including social security and health contributions and/or the wages for participants, including social security and health contributions.
The rate for unit costs 13-17 and 19-27 may be adjusted by replacing the initial direct staff costs, including social security and health contributions, in the calculation method that consists of direct staff costs, including social security and health contributions, plus indirect costs.
The rate for unit cost 18 may be adjusted by replacing the salaries for participants, including social security and health contributions in the calculation method that consists of the cost for provision of training plus salaries for participants, including social security and health contributions, plus indirect costs.
Adjustments will be based on the updated data as follows:
for the minimum wage, amendments to the minimum wage as set by government decree no. 567/2006 Coll;
for social security contributions, amendments to employers' contributions to social security, defined in Act no. 589/1992 Coll. on social security; and
for health contributions, amendments to employers' contributions to health insurance, defined in Act no. 592/1992 Coll. on premiums for health insurance.
For average salaries to determine wages/staff costs, changes to the latest annual published data for relevant categories from the average earnings informational system (www.ISPV.cz).’
ANNEX V
Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Malta
1.
Definition of standard scales of unit costs
As defined in Regulation (EU) No 651/2014.
Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts(in EUR) 1.
Employment Aid (A2E Scheme) under Priority axis 1 of the ESF Operational Programme II “Investing in human capital to create more opportunities and promote the wellbeing of society” (2014MT05SFOP001)
Employment aid paid per week to workers who are disadvantaged, severely disadvantaged or with disabilitiesf13. All costs related to the Employment Subsidy. Number of weeks in employment per employee.
- 1..
Disadvantaged worker – 85 per week for a maximum of 52 weeks.
- 2..
Severely disadvantaged worker – 85 per week for a maximum of 104 weeks.
- 3..
Worker with disabilities – 125 per week for a maximum of 156 weeks.
2.
Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II “Investing in human capital to create more opportunities and promote the wellbeing of society” (2014MT05SFOP001)
Participation in one hour of accredited or non-accredited external training Direct costs of providing external training Number of completed hours per participant 25 3.
Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II “Investing in human capital to create more opportunities and promote the wellbeing of society” (2014MT05SFOP001)
Provision of one hour of accredited or non-accredited internal training. Salary costs for internal trainer. Number of completed hours of training provided per trainer. 4,90 4.
Training aid (Investing In Skills scheme) to enterprises in the private sector under Priority Axis 3 of the ESF Operational Programme II “Investing in human capital to create more opportunities and promote the wellbeing of society” (2014MT05SFOP001)
Participation in one hour of accredited or non-accredited internal or external training. Salary costs for participant. Number of completed hours per participant. 4,90 2.
Adjustment of amounts
Unit cost 1 may be adjusted by replacing the initial minimum wage and/or the statutory bonus and/or weekly allowances and/or social security contributions in the calculation method that consists of the lowest weekly rate of national minimum wage for a particular year, the statutory bonus, weekly allowances and social security contributions, and dividing this result by 2.
Unit Cost 2 may be adjusted by applying the annual rate of inflation to the respective rates. From 2017, for a given year N, this can be be done by applying the inflation rate for year N-1 as published by the Maltese National Statistics Office at: https://nso.gov.mt/en/nso/Selected_Indicators/Retail_Price_Index/Pages/Index-of-Inflation.aspx
Unit costs 3-4 may be adjusted by replacing the initial national minimum wage for persons 18 years or over and/or the statutory bonuses and/or weekly allowances and/or social security contributions in the calculation method that consists of the hourly rate of national minimum wage for persons 18 years or over for a particular year, the statutory bonuses, the weekly allowances and social security contributions.
Adjustments will be based on updated data as follows:
The national minimum wage is specified in national Subsidiary Legislation 452.71 (National Minimum Wage Standing Order).
The statutory bonuses, weekly allowances and social security contributions provided for in Chapter 452 of the Maltese legislation on the Employment and Industrial relations Act.
ANNEX VI
Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Italy
1.
Definition of standard scales of unit costs
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 1.B of NOP YEI but with different target groups.
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 1.C of NOP YEI but with different target groups.
‘Similar operations’ are to be understood as including those operations with similar activities to those in measures 2A, 2B, 4A, 4C and 7.1 of NOP YEI but with different target groups.
For unit cost number 3 relating to training for self-employment and self-entrepreneurship, the amount will be reimbursed only in the case of group formation of 4 or more students.
The definition of the classes is in accordance with the provisions of Ministerial Circular no. 2 of 2 February 2009. This Circular defines the classes according to the type of teachers providing training.
Similar operations is to be understood as including those operations with similar activities to those in measure 3 of NOP YEI but with different target groups.
The young person will be profiled according to one of the four classes (low, medium, high, very high) on the basis of the following variables:
age;
sex;
education;
employment status one year before;
region and province where the competent body which took in charge the young is based;
language skills (only for non-nationals who have not obtained the educational qualification in Italy), for the evaluation of which will be used the already developed methodology for the issuance of an EC residence permit for long-term residents.
Based on the variables identified for the young, a “disadvantage coefficient” is calculated, with a value between 0 and 1.
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 5 of NOP YEI but with different target groups.
‘Similar operations’ are to be understood as including those operations with similar activities to those in NOP YEI but with different target groups.
‘Similar operations’ is to be understood as including those operations with similar activities to those in measure 7.1 of NOP YEI but with different target groups.
For unit cost number 8 relating to support for self-employment and self-entrepreneurship, the amount will be reimbursed only in the case of individual or individualised training (‘individualised’ meaning a maximum of 3 students).
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 8 of NOP YEI but with different target groups.
The amounts in table 3.4 are the maximum allowance payable. Where an employer provides an allowance to cover travel, accommodation or meals, the allowance mentioned in point 3.4 will be reduced by:
the amount mentioned in point 3.1 for travel (depending on location)
the amount mentioned in point 3.2 for accommodation (depending on location)
the amount mentioned in point 3.3 for meals (depending on location).
The amounts mentioned in tables 3.1, 3.2 and 3.3. will also be payable in a situation where the beneficiary pays only the categories of allowances mentioned in those tables.
Additional specific support is limited to one unit per student per module.
Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts(in EUR) 1.
Measure 1.B of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operationsf14 under:
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
Hourly rate for 1st guidance level support All eligible costs, including direct staff costs. Number of hours providing 1st guidance level support. 34,00 2.
Measure 1.C of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operationsf15 under:
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
Hourly rate for specialist or 2nd guidance level support. All eligible costs, including direct staff costs. Number of hours providing specialist or 2nd guidance level support. 35,50 3.
Measures 2.A, 2.B, 4.A, 4.C and 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operationsf16 under:
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
A.
Hourly rate for the following tranings:
Training focused on integration in the labour market;
Reintegration in the schooling and training system for young people aged between 15 and 18;
Apprenticeship for qualification and professional diploma;
Apprenticeship for higher training and research;
Training for self-employment and self-entrepreneurshipf17
This hourly rate depends on the type of class (A, B or Cf18)
B.
Hourly rate per student participating in the training
All eligible costs, including direct staff costs and excluding any allowance paid to participants. Number of hours per training course differentiated by type of class, and the number of hours per student. TYPE OF CLASS HOURLY RATE PER COURSE HOURLY RATE PER STUDENT C 73,13 0,80 B 117,00 A 146,25 4.
Measure 3 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operationsf19 under:
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
New employment contracts as a result of job coaching All eligible costs, including direct staff costs Number of new employment contracts, differentiated by type of contract and profile classification (from low to very high)f20 Profile Classification LOW MEDIUM HIGH VERY HIGH Open-ended contract and 1st and 3rd level apprenticeship contract 1 500 2 000 2 500 3 000 2nd level apprenticeship, fixed-term and temporary contract ≥ 12 months 1 000 1 300 1 600 2 000 fixed-term and temporary contract 6-12 months 600 800 1 000 1 200 5.
Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operationsf21 under:
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
New regional/interregional/transnational traineeships All eligible costs including direct staff costs for providing a traineeship. Number of traineeships, differentiated by profile classification. LOW MEDIUM HIGH VERY HIGH REGIONAL / INTERREGIONAL/TRANSNATIONAL 200 300 400 500 6.
Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations under:
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
Traineeships under interregional mobility For interregional mobility: all eligible costs, including travel, accommodation and meals, but excluding participant allowances Number of traineeships, differentiated by location and, for interregional mobility, the length of traineeship. Interregional mobility as per the rates set out in point 3.4 Traineeships under transnational mobility For transnational mobility: all eligible costs. Transnational mobility as per the rates set in point 3.5 7.
Measure 6 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operationsf22 under:
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Molise 2014IT16M2OP001
POR Piemonte 2014IT05SFOP013
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
30 hour block of general preparatory training for access to the civil service All eligible costs, including direct staff costs, excluding allowances and insurance. Number of participants completing the 30 hour block of training. 90 8.
Measure 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operationsf23 under:
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Emilia Romagna 2014IT05SFOP003
POR Friuli VG 2014IT05SFOP004
POR Lazio 2014IT05SFOP005
POR Molise 2014IT16M2OP001
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
Hourly rate of support for self-employment and self-entrepreneurshipf24 All eligible costs, including direct staff costs, but excluding any allowance. Number of hours of support provided to participants. 40 9.
Measure 8 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operationsf25 under:
POR Abruzzo 2014IT05SFOP009
POR Basilicata 2014IT05SFOP016
PO Bolzano 2014IT05SFOP017
POR Calabria 2014IT16M2OP006
POR Campania 2014IT05SFOP020
POR Liguria 2014IT05SFOP006
POR Molise 2014IT16M2OP001
POR Puglia 2014IT16M2OP002
POR Sardegna 2014IT05SFOP021
POR Sicilia 2014IT05SFOP014
PO Trento 2014IT05SFOP018
POR Umbria 2014IT05SFOP010
POR Valle D'Aosta 2014IT05SFOP011
PON SPAO 2014IT05SFOP002
POR Toscana FSE 2014IT05SFOP015
- A..
Employment contracts following professional interregional mobility or professional transnational mobility;
- B..
Job interview under professional transnational mobility
All eligible costs (one off subsidy for travel, accommodation and meals, and an interview allowance), not including any additional allowances for disadvantaged people and any allowances for travel, accommodation or meals under interregional mobility provided by employer. Number of employment contracts or job interviews, differentiated by location
Professional interregional mobility as per the amounts for more than 600 hours set out in point 3.4.f26
Professional transnational mobility for interview purposes as per the amounts set out in point 3.6.
Professional transnational mobility as per the amounts set out in point 3.7.
10.
Operations increasing the number of Industrial PhD positions under the following Operational Programmes:
PON Ricerca 2014 IT16M20P005
POR Basilicata FSE 2014IT05SFOP016
POR Campania FSE 2014IT05SFOP020
POR Puglia FESR FSE 2014IT16M2OP002
POR Calabria FESR FSE 2014IT16M2OP006
POR Abruzzo FSE 2014IT05SFOP009
POR Sardegna FSE 2014IT05SFOP021
POR Molise FESR FSE 2014IT16M2OP001
POR Friuli Venezia Giulia FSE 2014IT05SFOP004
POR Liguria FSE 2014IT05SFOP006
POR Lombardia FSE 2014IT05SFOP007
POR Valle d'Aosta FSE 2014IT05SFOP011
POR Toscana FSE 2014IT05SFOP015
PA Bolzano FSE 2014IT05SFOP017
POR Sicilia FSE 2014IT05SFOP014
POR Umbria FSE 2014IT05SFOP010
POR Emilia Romagna FSE 2014IT05SFOP003
PA Trento 2014IT05SFOP018
Months spent working on PhD. All eligible costs for the participant (salary and associated social security contributions) and the institution providing the PhD (direct and indirect costs). Number of months spent working on PhD, according to location in Italy or abroad. Without a period spent abroad:
1 927,63 per month
With a period spent abroad:
2 891,45 per month
11.
Adult training under OP Education 2014IT05M20P001
Participants gaining a certificate in adult training All categories of costs Number of participants gaining a certificate in adult training, differentiated by length of module and additional specific supportf27
327 (30 hour module)
357 (30 hour module with additional specific support)
654 (60 hour module)
684 (60 hour module with additional specific support)
1 090 (100 hour module)
1 120 (100 hour module with additional specific support)
12.
Activities related to Citizenship and the Rule of Law under OP Education 2014IT05M20P001
Participants gaining a certificate in initiatives related to ‘Citizenship and Rule of Law’. All categories of costs Number of participants gaining a certificate related to ‘Citizenship and Rule of Law’, differentiated by length of module, additional specific support, and meal allowance.
191,10 (30 hour module)
221,10 (30 hours with additional specific support)
261,10 (30 hours with meal allowance)
291,10 (30 hours with additional specific support and meal allowance)
382,20 (60 hour module)
412,20 (60 hours with additional specific support)
522,20 (60 hours with meal allowance)
552,20 (60 hours with additional specific support and meal allowance)
637,00 (100 hour module)
667,00 (100 hours with additional specific support)
871,00 (100 hours with meal allowance)
901,00 (100 hours with additional specific support and meal allowance)
13.
Classroom training under OP Education 2014IT05M20P001
Participants gaining a certificate in classroom training All categories of costs Number of participants gaining a certificate in classroom training, differentiated by length of module, additional specific support and meal allowance.
360,60 (30 hour module)
390,60 (30 hours with additional specific support)
430,60 (30 hours with meal allowance)
460,60 (30 hours with additional specific support and meal allowance)
721,20 (60 hour module)
751,20 (60 hours with additional specific support)
861,20 (60 hours with meal allowance)
891,20 (60 hours with additional specific support and meal allowance)
1 202,0 (100 hour module)
1 232,0 (100 hours with additional specific support)
1 436,0 (100 hours with meal allowance)
1 466,0 (100 hours with additional specific support and meal allowance )
14.
Language training in context of transnational mobility under OP Education 2014IT05M20P001
Participants gaining a certificate in language training following transnational mobility. All categories of costs, except travel and accommodation costs for persons accompanying participants. Number of participants gaining a certificate in language training following transnational mobility, differentiated by length of module, country and length of stay, and distance travelled
774,00 (40 hour module)
1 161,0 (60 hour module)
1 548,0 (80 hour module)
To these amounts for each participant can be added a daily amount to cover accommodation costs, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs:
Km Amount 100-499
500-1 999
2 000-2 999
3 000-3 999
4 000-7 999
8 000-19 999
·
·
·
·
·
·
180
275
360
530
820
1 100
15.
Internships under OP Education 2014IT05M20P001
Participants gaining an internship certificate, with or without transnational mobility. All categories of costs, except travel and accommodation for persons accompanying participants. Number of participants gaining an internship certificate, with or without transnational mobility, differentiated by length of module and, where transnational mobility is included, country, length of stay, and distance travelled
786,60 (60 hour module)
1 179,9 (90 hour module)
1 573,2 (120 hour module)
3 146,4 (240 hour module)
For internships with transnational mobility, these amounts for each participant can be supplemented by a daily amount to cover accommodation costs, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs:
Km Amount 100-499
500-1 999
2 000-2 999
3 000-3 999
4 000-7 999
8 000-19 999
·
·
·
·
·
·
180
275
360
530
820
1 100
16.
Language training and internships in the context of transnational mobility under OP Education 2014IT05M20P001
Persons accompanying participants. Accommodation and travel costs Number of persons accompanying participants. Accommodation Costs per participant, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs: Km Amount 100-499
500-1 999
2 000-2 999
3 000-3 999
4 000-7 999
8 000-19 999
·
·
·
·
·
·
180
275
360
530
820
1 100
2.
Adjustment of amounts
- (a)
For standard scales of unit costs 1-9, the amounts may be adjusted where the FOI index (consumer price index for blue and white collar worker households, excluding tobacco products) shows a monetary revaluation equal to or exceeding 5 %. In particular, in a given year y, the adjustment is made if in a period y + t the difference between the benchmarking coefficients shown by the FOI index for such years is equal to or higher than 5 %. The base year applied — and on the basis of which the amounts were adjusted — is 2014. Where this rate is equal to or higher than 5 %, each unit cost may be adjusted accordingly.
- (b)
For standard scale of unit costs 10, the rate may be adjusted by replacing the montly scholarship and/or social security contributions in the calculation method that consists of monthly scholarship plus social security contributions plus an amount for all other costs. Updated data can be found in amendments to the Ministerial Decree of 18.6.2008 (which defines the total gross annual amount of PhD scholarships) and biannual adjustment of the rate of social security contributions (Circular letter No. 13 of 29.1.2016 of the Director General of INPS, the National Institute for Social Security).
- (c)
For standard scales of unit costs 11-15, which are based on the historical average number of certificates (output) awarded per module, the rate may be adjusted at the end of each financial year (31/12) following an assessment by the Managing Authority of the implementation of the operations related to each of the unit costs. Where such an assessment shows a divergence in the average number of certificates awarded per module for each type of training as compared to the average number used as the basis for calculating the existing unit cost, then a new unit cost will be calculated according to the following formula:
UCnew = UCold + Variation
where
Variation = UCold – (UCold * Outputnew / Outputold)
3.1
Interregional travel costs (in EUR)
Region of origin Travel costs Destination region Valle d'Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 269,30 211,17 198,50 148,63 231,83 232,74 201,95 226,34 167,99 68,60 58,98 0,00 23,32 25,81 125,43 45,79 83,99 93,05 164,82 165,16 182,46 Basilicata 271,11 236,02 227,31 236,81 294,55 239,98 259,23 264,89 201,50 176,59 97,35 83,99 142,75 67,92 33,96 31,24 0,00 55,47 71,43 114,33 224,18 Calabria 369,32 285,04 273,72 242,02 351,32 340,51 304,28 304,39 270,32 238,63 243,15 164,82 178,18 139,01 90,33 85,58 71,43 69,05 0,00 75,62 280,55 Campania 253,00 271,68 259,06 113,20 246,78 221,87 165,84 302,24 178,86 160,74 169,86 125,43 151,01 99,62 0,00 21,28 33,96 89,20 90,33 113,20 190,22 Emilia-Romagna 146,48 81,50 74,71 38,26 129,05 92,82 63,39 55,47 0,00 54,34 62,26 167,99 52,07 131,31 178,86 160,52 201,50 140,37 270,32 292,06 188,94 Friuli Venezia Giulia 129,05 103,24 82,30 120,22 175,52 99,62 37,36 0,00 55,47 70,18 163,01 226,34 162,50 113,20 302,24 218,87 264,89 241,12 304,39 325,00 279,13 Lazio 230,31 172,06 160,74 129,05 210,55 201,50 165,27 113,20 131,31 99,62 70,18 25,81 54,34 0,00 99,62 29,21 67,92 113,20 139,01 138,10 156,65 Liguria 53,66 113,94 105,11 0,00 36,22 49,81 106,41 120,22 38,26 67,47 118,07 148,63 75,50 129,05 113,20 152,03 236,81 250,17 242,02 231,61 224,15 Lombardia 59,37 97,35 76,47 49,81 67,92 0,00 69,05 99,62 92,82 113,20 108,67 232,74 84,90 201,50 221,87 223,91 239,98 179,99 340,51 335,07 179,51 Marche 200,25 84,90 76,98 118,07 119,99 108,67 70,18 163,01 62,26 108,11 0,00 58,98 43,92 70,18 169,86 75,96 97,35 107,54 243,15 216,21 251,20 Molise 259,51 196,06 194,31 152,03 232,97 223,91 194,48 218,87 160,52 126,56 75,96 45,79 106,75 29,21 21,28 0,00 31,24 70,30 85,58 140,48 185,85 PA Bolzano 118,58 0,00 36,22 113,94 151,35 97,35 96,22 103,24 81,50 110,94 84,90 67,92 127,01 172,06 271,68 196,06 236,02 138,10 285,04 310,17 273,47 PA Trento 112,24 36,22 0,00 105,11 147,22 76,47 19,02 82,30 74,71 99,62 76,98 198,50 120,44 160,74 259,06 194,31 227,31 132,44 273,72 308,24 247,26 Piemonte 17,43 151,35 147,22 36,22 0,00 67,92 103,01 175,52 129,05 147,16 119,99 231,83 181,74 210,55 246,78 232,97 294,55 191,31 351,32 273,60 187,92 Puglia 275,59 138,10 132,44 250,17 191,31 179,99 164,71 241,12 140,37 212,82 107,54 93,05 156,78 113,20 89,20 70,30 55,47 0,00 69,05 147,61 279,42 Sardegna 205,36 273,47 247,26 224,15 187,92 179,51 248,56 279,13 188,94 189,41 251,20 182,46 210,98 156,65 190,22 185,85 224,18 279,42 280,55 185,82 0,00 Sicilia 350,35 310,17 308,24 231,61 273,60 335,07 303,38 325,00 292,06 273,94 216,21 165,16 189,50 138,10 113,20 140,48 114,33 147,61 75,62 0,00 185,82 Toscana 169,12 110,94 99,62 67,47 147,16 113,20 95,09 70,18 54,34 0,00 108,11 68,60 36,22 99,62 160,74 126,56 176,59 212,82 238,63 273,94 189,41 Umbria 199,18 127,01 120,44 75,50 181,74 84,90 125,14 162,50 52,07 36,22 43,92 23,32 0,00 54,34 151,01 106,75 142,75 156,78 178,18 189,50 210,98 Valle d'Aosta 0,00 118,58 112,24 53,66 17,43 59,37 155,03 129,05 146,48 169,12 200,25 269,30 199,18 230,31 253,00 259,51 271,11 275,59 369,32 350,35 205,36 Veneto 155,03 96,22 19,02 106,41 103,01 69,05 0,00 37,36 63,39 95,09 70,18 201,95 125,14 165,27 165,84 194,48 259,23 164,71 304,28 303,38 248,56 3.2
Interregional accommodation costs (for more than 600 hours) (in EUR)
Region of origin Accommodation costs Destination region Valle d'Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia- Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Basilicata 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Calabria 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Campania 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Emilia-Romagna 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Friuli Venezia Giulia 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Lazio 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Liguria 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Lombardia 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Marche 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Molise 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 PA Bolzano 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 PA Trento 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Piemonte 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Puglia 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Sardegna 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Sicilia 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Toscana 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Umbria 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Valle d'Aosta 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 Veneto 803,84 1 153,94 788,70 741,25 695,62 1 229,98 700,07 703,65 967,41 1 227,68 601,19 578,51 628,23 1 229,68 930,19 519,08 684,62 607,95 575,50 988,35 600,62 3.3
Interregional subsistence costs (for more than 600 hours) (in EUR)
Region of origin Meal costs Destination region Valle d'Aosta PA Bolzano PA Trento Liguria Piemonte Lombardia Veneto Friuli Venezia Giulia Emilia-Romagna Toscana Marche Abruzzo Umbria Lazio Campania Molise Basilicata Puglia Calabria Sicilia Sardegna Abruzzo 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Basilicata 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Calabria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Campania 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Emilia-Romagna 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Friuli Venezia Giulia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Lazio 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Liguria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Lombardia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Marche 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Molise 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 PA Bolzano 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 PA Trento 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Piemonte 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Puglia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Sardegna 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Sicilia 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Toscana 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Umbria 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Valle d'Aosta 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 Veneto 482,30 252,45 320,93 407,41 521,52 502,26 416,04 616,19 514,94 200,21 480,95 433,27 641,87 596,60 298,90 638,86 205,47 440,97 487,71 359,11 256,27 3.4
Interregional allowances for traineeships (in EUR)
No. of training hours Abruzzo Basilicata Calabria Campania Emilia Romagna Friuli Venezia Giulia Lazio Liguria Lombardia Marche Molise PA Bolzano PA Trento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valle d'Aosta Veneto Region where the training is taking place Valle d'Aosta 160 611,70 613,51 711,72 595,40 488,88 471,45 572,71 396,06 401,77 542,65 601,91 460,98 454,64 359,83 617,99 547,76 692,75 511,52 541,58 — 497,43 161-200 613,84 615,65 713,86 597,54 491,02 473,59 574,85 398,20 403,91 544,79 604,05 463,12 456,78 361,97 620,13 549,90 694,89 513,66 543,72 — 499,57 201-249 699,44 701,25 799,46 683,14 576,62 559,19 660,45 483,80 489,51 630,39 689,65 548,72 542,38 447,57 705,73 635,50 780,49 599,26 629,32 — 585,17 250-300 804,30 806,11 904,32 788,00 681,48 664,05 765,31 588,66 594,37 735,25 794,51 653,58 647,24 552,43 810,59 740,36 885,35 704,12 734,18 — 690,03 301-600 913,44 915,25 1 013,46 897,14 790,62 773,19 874,45 697,80 703,51 844,39 903,65 762,72 756,38 661,57 919,73 849,50 994,49 813,26 843,32 — 799,17 > 600 1 555,44 1 557,25 1 655,46 1 539,14 1 432,62 1 415,19 1 516,45 1 339,8 1 345,51 1 486,39 1 545,65 1 404,72 1 398,38 1 303,57 1 561,73 1 491,5 1 636,49 1 455,26 1 485,32 — 1 441,17 Bolzano 160 585,59 610,44 659,45 646,09 455,92 477,65 546,48 488,35 471,77 459,31 570,48 — 410,64 525,76 512,52 647,88 684,58 485,35 501,42 492,99 470,63 161-200 587,93 612,78 661,79 648,43 458,26 479,99 548,82 490,69 474,11 461,65 572,82 — 412,98 528,10 514,86 650,22 686,92 487,69 503,76 495,33 472,97 201-249 681,53 706,38 755,39 742,04 551,86 573,60 642,42 584,29 567,71 555,26 666,42 — 506,58 621,71 608,46 743,83 780,53 581,29 597,37 588,93 566,58 250-300 796,20 821,04 870,06 856,70 666,53 688,26 757,09 698,96 682,37 669,92 781,08 — 621,25 736,37 723,13 858,49 895,19 695,96 712,03 703,60 681,24 301-600 915,54 940,39 989,40 976,05 785,87 807,60 876,43 818,30 801,72 789,27 900,43 — 740,59 855,71 842,47 977,83 1 014,53 815,30 831,38 822,94 800,59 > 600 1 617,57 1 642,41 1 691,43 1 678,07 1 487,9 1 509,63 1 578,46 1 520,33 1 503,74 1 491,29 1 602,45 — 1 442,62 1 557,74 1 544,5 1 679,86 1 716,56 1 517,33 1 533,4 1 524,97 1 502,61 Trento 160 493,91 522,71 569,13 554,47 370,12 377,71 456,15 400,52 371,88 372,38 489,72 331,63 — 442,63 427,85 542,67 603,65 395,02 415,85 407,65 314,43 161-200 495,75 524,56 570,97 556,31 371,97 379,55 458,00 402,36 373,72 374,23 491,56 333,48 — 444,47 429,70 544,52 605,50 396,87 417,70 409,49 316,27 201-249 569,60 598,41 644,82 630,17 445,82 453,40 531,85 476,21 447,57 448,08 565,42 407,33 — 518,32 503,55 618,37 679,35 470,72 491,55 483,35 390,12 250-300 660,07 688,88 735,29 720,63 536,29 543,87 622,32 566,68 538,04 538,55 655,88 497,80 — 608,79 594,02 708,84 769,82 561,19 582,02 573,81 480,59 301-600 754,23 783,04 829,46 814,80 630,45 638,03 716,48 660,84 632,20 632,71 750,05 591,96 — 702,95 688,18 803,00 863,98 655,35 676,18 667,98 574,76 > 600 1 308,13 1 336,93 1 383,35 1 368,69 1 184,34 1 191,93 1 270,37 1 214,74 1 186,1 1 186,61 1 303,94 1 145,85 — 1 256,85 1 242,07 1 356,89 1 417,87 1 209,25 1 230,07 1 221,87 1 128,65 Liguria 160 454,43 542,61 547,82 419,00 344,06 426,02 434,85 — 355,61 423,87 457,83 419,74 410,91 342,02 555,97 529,95 537,41 373,27 381,30 359,46 412,21 161-200 456,34 544,52 549,73 420,91 345,97 427,93 436,76 — 357,52 425,78 459,74 421,65 412,82 343,93 557,88 531,86 539,32 375,18 383,21 361,37 414,12 201-249 532,79 620,97 626,18 497,36 422,42 504,38 513,21 — 433,97 502,23 536,19 498,10 489,27 420,38 634,33 608,31 615,77 451,63 459,66 437,82 490,57 250-300 626,44 714,63 719,83 591,01 516,07 598,03 606,86 — 527,62 595,88 629,84 591,75 582,92 514,04 727,98 701,96 709,42 545,28 553,32 531,47 584,22 301-600 723,92 812,10 817,31 688,48 613,55 695,50 704,33 — 625,09 693,35 727,31 689,22 680,39 611,51 825,46 799,43 806,89 642,75 650,79 628,94 681,69 > 600 1 297,29 1 385,47 1 390,68 1 261,86 1 186,92 1 268,88 1 277,71 — 1 198,47 1 266,73 1 300,69 1 262,59 1 253,76 1 184,88 1 398,83 1 372,81 1 380,27 1 216,13 1 224,16 1 202,32 1 255,07 Piemonte 160 555,86 618,58 675,35 570,81 453,08 499,55 534,58 360,26 391,95 444,02 557,00 475,38 471,25 — 515,34 511,95 597,64 471,19 505,77 341,46 427,04 161-200 557,89 620,60 677,37 572,83 455,10 501,57 536,61 362,28 393,98 446,05 559,02 477,40 473,27 — 517,36 513,98 599,66 473,22 507,80 343,49 429,07 201-249 638,90 701,61 758,38 653,84 536,11 582,58 617,62 443,29 474,98 527,06 640,03 558,41 554,28 — 598,37 594,99 680,67 554,22 588,81 424,50 510,08 250-300 738,13 800,85 857,61 753,07 635,35 681,82 716,85 542,52 574,22 626,29 739,26 657,65 653,52 — 697,61 694,22 779,90 653,46 688,04 523,73 609,31 301-600 841,42 904,13 960,90 856,36 738,63 785,10 820,14 645,81 677,50 729,58 842,55 760,93 756,80 — 800,89 797,51 883,19 756,74 791,33 627,02 712,60 > 600 1 448,98 1 511,69 1 568,46 1 463,92 1 346,19 1 392,66 1 427,69 1 253,37 1 285,06 1 337,13 1 450,11 1 368,49 1 364,36 — 1 408,45 1 405,07 1 490,75 1 364,3 1 398,88 1 234,57 1 320,15 Lombardia 160 693,90 701,15 801,67 683,03 553,99 560,78 662,66 510,97 — 569,83 685,07 558,51 537,63 529,08 641,15 640,67 796,23 574,36 546,06 520,54 530,21 161-200 696,78 704,03 804,55 685,92 556,87 563,66 665,54 513,85 — 572,72 687,95 561,40 540,51 531,96 644,03 643,56 799,12 577,24 548,94 523,42 533,10 201-249 812,07 819,32 919,84 801,21 672,16 678,95 780,83 629,14 — 688,01 803,24 676,69 655,80 647,26 759,32 758,85 914,41 692,54 664,24 638,71 648,39 250-300 953,31 960,55 1 061,07 942,44 813,39 820,18 922,06 770,37 — 829,24 944,48 817,92 797,03 788,49 900,55 900,08 1 055,64 833,77 805,47 779,94 789,62 301-600 1 100,3 1 107,55 1 208,07 1 089,43 960,39 967,18 1 069,06 917,37 — 976,23 1 091,47 964,91 944,03 935,48 1 047,55 1 047,07 1 202,63 980,76 952,46 926,94 936,61 > 600 1 964,98 1 972,23 2 072,75 1 954,11 1 825,07 1 831,86 1 933,74 1 782,05 — 1 840,91 1 956,15 1 829,59 1 808,71 1 800,16 1 912,23 1 911,75 2 067,31 1 845,44 1 817,14 1 791,61 1 801,29 Veneto 160 499,08 556,36 601,42 462,97 360,53 334,49 462,41 403,54 366,19 367,32 491,61 393,36 316,15 400,15 461,84 545,70 600,51 392,22 422,28 452,16 — 161-200 500,94 558,22 603,27 464,83 362,38 336,35 464,26 405,40 368,04 369,18 493,47 395,21 318,01 402,00 463,70 547,56 602,37 394,08 424,13 454,02 — 201-249 575,22 632,50 677,56 539,11 436,67 410,63 538,55 479,68 442,33 443,46 567,75 469,50 392,29 476,29 537,98 621,84 676,65 468,36 498,42 528,30 — 250-300 666,22 723,50 768,56 630,11 527,67 501,63 629,55 570,68 533,33 534,46 658,75 560,49 483,29 567,29 628,98 712,84 767,65 559,36 589,42 619,30 — 301-600 760,93 818,21 863,27 724,82 622,38 596,34 724,26 665,39 628,04 629,17 753,46 655,21 578,00 662,00 723,69 807,55 862,36 654,07 684,13 714,01 — > 600 1 318,06 1 375,34 1 420,39 1 281,95 1 179,51 1 153,47 1 281,39 1 222,52 1 185,17 1 186,3 1 310,59 1 212,33 1 135,13 1 219,13 1 280,82 1 364,68 1 419,49 1 211,2 1 241,26 1 271,14 — Friuli Venezia Giulia 160 577,72 616,26 655,77 653,62 406,84 — 464,57 471,59 450,99 514,38 570,24 454,61 433,67 526,89 592,49 630,50 676,37 421,56 513,87 480,42 388,73 161-200 579,91 618,46 657,96 655,81 409,04 — 466,77 473,79 453,18 516,58 572,44 456,81 435,86 529,08 594,68 632,70 678,57 423,75 516,07 482,62 390,92 201-249 667,75 706,30 745,81 743,66 496,88 — 554,61 561,63 541,03 604,42 660,28 544,65 523,71 616,93 682,53 720,54 766,41 511,60 603,91 570,46 478,77 250-300 775,36 813,91 853,41 851,26 604,49 — 662,22 669,24 648,63 712,03 767,89 652,26 631,32 724,54 790,13 828,15 874,02 619,20 711,52 678,07 586,37 301-600 887,36 925,91 965,41 963,26 716,49 — 774,22 781,24 760,63 824,03 879,89 764,26 743,31 836,54 902,13 940,15 986,02 731,20 823,52 790,07 698,37 > 600 1 546,18 1 584,73 1 624,24 1 622,09 1 375,31 — 1 433,04 1 440,06 1 419,46 1 482,85 1 538,71 1 423,08 1 402,14 1 495,36 1 560,96 1 598,97 1 644,84 1 390,03 1 482,34 1 448,89 1 357,2
No. of training hours Abruzzo Basilicata Calabria Campania Emilia Romagna Friuli Venezia Giulia Lazio Liguria Lombardia Marche Molise PA Bolzano PA Trento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valle d'Aosta Veneto Region where the training is taking place Emilia Romagna 160 562,62 596,13 664,95 573,49 — 450,10 525,95 432,89 487,46 456,89 555,15 476,14 469,35 523,68 535,00 583,58 686,69 448,97 446,71 541,11 458,03 161-200 565,09 598,60 667,42 575,96 — 452,57 528,41 435,36 489,92 459,36 557,62 478,60 471,81 526,15 537,47 586,04 689,16 451,44 449,17 543,58 460,49 201-249 663,75 697,25 766,08 674,61 — 551,23 627,07 534,02 588,58 558,02 656,28 577,26 570,47 624,81 636,13 684,70 787,81 550,09 547,83 642,24 559,15 250-300 784,60 818,11 886,94 795,47 — 672,08 747,93 654,88 709,44 678,87 777,13 698,12 691,33 745,66 756,98 805,56 908,67 670,95 668,69 763,10 680,01 301-600 910,39 943,90 1 012,73 921,26 — 797,87 873,72 780,67 835,23 804,66 902,92 823,91 817,12 871,45 882,77 931,35 1 034,46 796,74 794,48 888,88 805,80 > 600 1 650,33 1 683,84 1 752,66 1 661,2 — 1 537,81 1 613,65 1 520,6 1 575,16 1 544,6 1 642,86 1 563,84 1 557,05 1 611,39 1 622,71 1 671,28 1 774,4 1 536,68 1 534,41 1 628,82 1 545,73 Toscana 160 448,73 556,73 618,76 540,88 434,47 450,32 479,75 447,60 493,34 488,24 506,69 491,07 479,75 527,30 592,95 569,54 654,08 — 416,36 549,26 475,22 161-200 451,11 559,10 621,14 543,26 436,85 452,70 482,13 449,98 495,71 490,62 509,07 493,45 482,13 529,67 595,33 571,92 656,46 — 418,74 551,63 477,60 201-249 546,14 654,14 716,17 638,29 531,88 547,73 577,16 545,01 590,75 585,65 604,10 588,48 577,16 624,71 690,36 666,95 751,49 — 513,77 646,67 572,63 250-300 662,56 770,55 832,59 754,71 648,30 664,15 693,58 661,43 707,16 702,07 720,52 704,90 693,58 741,12 806,78 783,37 867,91 — 630,19 763,08 689,05 301-600 783,73 891,72 953,76 875,87 769,47 785,31 814,75 782,60 828,33 823,24 841,69 826,07 814,75 862,29 927,95 904,54 989,07 — 751,35 884,25 810,22 > 600 1 496,48 1 604,48 1 666,51 1 588,63 1 482,22 1 498,07 1 527,5 1 495,35 1 541,08 1 535,99 1 554,44 1 538,82 1 527,5 1 575,04 1 640,7 1 617,29 1 701,83 — 1 464,11 1 597,01 1 522,97 Marche 160 347,07 385,44 531,24 457,95 350,35 451,10 358,27 406,16 396,76 — 364,05 372,99 365,07 408,08 395,63 539,29 504,30 396,20 332,01 488,34 358,27 161-200 348,87 387,24 533,04 459,75 352,15 452,90 360,07 407,96 398,56 — 365,85 374,79 366,87 409,88 397,43 541,09 506,10 398,00 333,81 490,14 360,07 201-249 420,89 459,27 605,07 531,77 424,17 524,92 432,10 479,98 470,59 — 437,87 446,81 438,89 481,91 469,45 613,12 578,13 470,02 405,83 562,16 432,10 250-300 509,12 547,49 693,29 620,00 512,40 613,15 520,32 568,21 558,81 — 526,10 535,04 527,12 570,13 557,68 701,34 666,35 558,25 494,06 650,39 520,32 301-600 600,95 639,32 785,12 711,83 604,23 704,98 612,15 660,04 650,64 — 617,93 626,87 618,95 661,96 649,51 793,17 758,18 650,08 585,89 742,22 612,15 >600 1 141,12 1 179,49 1 325,29 1 251,99 1 144,4 1 245,15 1 152,32 1 200,21 1 190,81 — 1 158,1 1 167,04 1 159,11 1 202,13 1 189,68 1 333,34 1 298,35 1 190,24 1 126,06 1 282,39 1 152,32 Abruzzo 160 — 353,35 434,18 394,78 437,35 495,70 295,17 417,99 502,10 328,34 315,15 337,28 467,86 501,19 362,41 451,81 434,52 337,96 292,68 538,66 471,31 161-200 — 355,04 435,86 396,47 439,03 497,39 296,85 419,67 503,78 330,02 316,83 338,96 469,54 502,88 364,09 453,50 436,20 339,64 294,36 540,35 472,99 201-249 — 422,38 503,20 463,81 506,37 564,73 364,19 487,01 571,12 397,36 384,17 406,30 536,88 570,22 431,43 520,84 503,54 406,98 361,70 607,69 540,33 250-300 — 504,87 585,69 546,30 588,86 647,22 446,68 569,51 653,61 479,85 466,66 488,79 619,37 652,71 513,92 603,33 586,03 489,47 444,19 690,18 622,82 301-600 — 590,73 671,55 632,16 674,72 733,08 532,54 655,36 739,47 565,71 552,52 574,65 705,23 738,57 599,78 689,19 671,89 575,33 530,05 776,03 708,68 > 600 — 1 095,77 1 176,6 1 137,21 1 179,77 1 238,12 1 037,59 1 160,41 1 244,52 1 070,76 1 057,57 1 079,7 1 210,28 1 243,61 1 104,83 1 194,24 1 176,94 1 080,38 1 035,1 1 281,08 1 213,73 Umbria 160 361,45 480,87 516,31 489,14 390,20 500,63 392,46 413,63 423,03 382,05 444,88 465,14 458,57 519,87 494,91 549,11 527,63 374,35 — 537,30 463,27 161-200 363,56 482,99 518,42 491,25 392,31 502,74 394,58 415,75 425,14 384,16 446,99 467,25 460,69 521,98 497,02 551,22 529,74 376,47 — 539,42 465,38 201-249 448,09 567,52 602,95 575,78 476,85 587,27 479,11 500,28 509,67 468,70 531,52 551,78 545,22 606,52 581,56 635,76 614,27 461,00 — 623,95 549,92 250-300 551,65 671,07 706,50 679,34 580,40 690,82 582,66 603,83 613,23 572,25 635,07 655,34 648,77 710,07 685,11 739,31 717,82 564,55 — 727,50 653,47 301-600 659,42 778,85 814,28 787,11 688,18 798,60 690,44 711,61 721,00 680,03 742,85 763,12 756,55 817,85 792,89 847,09 825,60 672,33 — 835,28 761,25 > 600 1 293,42 1 412,84 1 448,27 1 421,11 1 322,17 1 432,59 1 324,43 1 345,6 1 355,0 1 314,02 1 376,84 1 397,11 1 390,54 1 451,84 1 426,88 1 481,08 1 459,59 1 306,32 — 1 469,27 1 395,24 Lazio 160 512,01 554,12 625,21 585,81 617,51 599,40 — 615,25 687,69 556,38 515,40 658,26 646,94 696,75 599,40 642,84 624,30 585,81 540,53 716,50 651,47 161-200 515,05 557,16 628,25 588,85 620,55 602,44 — 618,28 690,73 559,42 518,44 661,30 649,98 699,79 602,44 645,88 627,34 588,85 543,57 719,54 654,51 201-249 636,60 678,71 749,80 710,40 742,10 723,99 — 739,83 812,28 680,97 639,99 782,85 771,53 821,34 723,99 767,43 748,89 710,40 665,12 841,09 776,06 250-300 785,49 827,60 898,69 859,30 891,00 872,88 — 888,73 961,18 829,87 788,89 931,75 920,43 970,24 872,88 916,33 897,79 859,30 814,02 989,99 924,96 301-600 940,47 982,58 1 053,67 1 014,27 1 045,97 1 027,86 — 1 043,71 1 116,15 984,84 943,86 1 086,72 1 075,4 1 125,21 1 027,86 1 071,31 1 052,76 1 014,27 968,99 1 144,96 1 079,93 > 600 1 852,09 1 894,2 1 965,29 1 925,89 1 957,59 1 939,48 — 1 955,33 2 027,77 1 896,46 1 855,48 1 998,34 1 987,02 2 036,83 1 939,48 1 982,93 1 964,38 1 925,89 1 880,61 2 056,58 1 991,55 Campania 160 452,64 361,17 417,55 — 506,07 629,46 426,83 440,41 549,08 497,07 348,49 598,89 586,27 573,99 416,41 517,43 440,41 487,96 478,22 580,21 493,05 161-200 454,68 363,22 419,59 — 508,11 631,50 428,87 442,46 551,13 499,11 350,54 600,94 588,32 576,03 418,46 519,48 442,46 490,00 480,27 582,26 495,10 201-249 536,49 445,02 501,39 — 589,92 713,30 510,68 524,26 632,93 580,92 432,34 682,74 670,12 657,84 500,26 601,28 524,26 571,80 562,07 664,06 576,90 250-300 636,69 545,23 601,60 — 690,13 813,51 610,89 624,47 733,14 681,13 532,55 782,95 770,33 758,05 600,47 701,49 624,47 672,01 662,28 764,27 677,11 301-600 740,99 649,53 705,90 — 794,42 917,81 715,18 728,77 837,44 785,42 636,85 887,25 874,63 862,34 704,77 805,79 728,77 776,31 766,58 868,57 781,41 > 600 1 354,52 1 263,05 1 319,43 — 1 407,95 1 531,34 1 328,71 1 342,29 1 450,96 1 398,95 1 250,37 1 500,77 1 488,15 1 475,87 1 318,29 1 419,31 1 342,29 1 389,84 1 380,1 1 482,09 1 394,93 Molise 160 354,06 339,51 393,85 329,55 468,79 527,14 337,48 460,30 532,18 384,23 — 504,33 502,58 541,24 378,57 494,12 448,75 434,83 415,02 567,78 502,75 161-200 355,99 341,44 395,78 331,48 470,71 529,07 339,40 462,22 534,11 386,15 — 506,26 504,50 543,16 380,49 496,05 450,68 436,75 416,94 569,71 504,67 201-249 433,05 418,51 472,84 408,55 547,78 606,14 416,47 539,29 611,17 463,22 — 583,33 581,57 620,23 457,56 573,12 527,75 513,82 494,01 646,78 581,74 250-300 527,46 512,92 567,25 502,95 642,19 700,54 510,88 633,70 705,58 557,63 — 677,73 675,98 714,64 551,97 667,52 622,15 608,23 588,42 741,18 676,15 301-600 625,72 611,18 665,51 601,21 740,45 798,81 609,14 731,96 803,84 655,89 — 776,00 774,24 812,90 650,23 765,78 720,41 706,49 686,68 839,44 774,41 > 600 1 203,73 1 189,18 1 243,52 1 179,22 1 318,46 1 376,81 1 187,14 1 309,97 1 381,85 1 233,9 — 1 354,0 1 352,25 1 390,9 1 228,24 1 343,79 1 298,42 1 284,5 1 264,69 1 417,45 1 352,42
No. of training hours Abruzzo Basilicata Calabria Campania Emilia Romagna Friuli Venezia Giulia Lazio Liguria Lombardia Marche Molise PA Bolzano PA Trento Piemonte Puglia Sardegna Sicilia Toscana Umbria Valle d'Aosta Veneto Region where the training is taking place Basilicata 160 320,95 — 308,39 270,92 438,46 501,85 304,88 473,77 476,94 334,31 268,20 472,98 464,27 531,51 292,43 461,14 351,29 413,55 379,71 508,07 496,19 161-200 322,44 — 309,87 272,40 439,94 503,33 306,36 475,26 478,43 335,79 269,68 474,46 465,75 532,99 293,91 462,62 352,77 415,03 381,19 509,56 497,67 201-249 381,68 — 369,11 331,64 499,18 562,57 365,60 534,50 537,67 395,03 328,92 533,70 524,99 592,23 353,15 521,86 412,01 474,27 440,43 568,80 556,91 250-300 454,25 — 441,68 404,21 571,75 635,14 438,17 607,07 610,23 467,60 401,49 606,27 597,56 664,80 425,72 594,43 484,58 546,84 513,00 641,36 629,48 301-600 529,78 — 517,21 479,74 647,28 710,67 513,70 682,60 685,77 543,13 477,02 681,80 673,09 740,33 501,25 669,96 560,11 622,37 588,53 716,90 705,01 > 600 974,08 — 961,51 924,04 1 091,58 1 154,97 958,00 1 126,9 1 130,07 987,43 921,33 1 126,1 1 117,39 1 184,63 945,55 1 114,26 1 004,41 1 066,67 1 032,83 1 161,2 1 149,31 Puglia 160 372,30 334,71 348,30 368,45 419,61 520,36 392,45 529,42 459,23 386,79 349,54 417,35 411,69 470,55 — 558,67 426,86 492,06 436,03 554,83 443,95 161-200 374,04 336,46 350,04 370,19 421,36 522,11 394,19 531,16 460,98 388,53 351,29 419,09 413,43 472,30 — 560,41 428,60 493,81 437,77 556,58 445,70 201-249 443,85 406,27 419,85 440,00 491,17 591,92 464,00 600,97 530,79 458,34 421,10 488,91 483,25 542,11 — 630,22 498,41 563,62 507,58 626,39 515,51 250-300 529,37 491,79 505,37 525,52 576,69 677,44 549,52 686,49 616,31 543,86 506,62 574,42 568,76 627,63 — 715,74 583,93 649,14 593,10 711,91 601,03 301-600 618,38 580,80 594,38 614,53 665,70 766,45 638,53 775,50 705,32 632,87 595,63 663,43 657,77 716,64 — 804,75 672,94 738,15 682,11 800,92 690,04 > 600 1 141,97 1 104,38 1 117,97 1 138,12 1 189,28 1 290,03 1 162,11 1 299,09 1 228,9 1 156,45 1 119,21 1 187,02 1 181,36 1 240,22 — 1 328,34 1 196,53 1 261,73 1 205,7 1 324,5 1 213,62 Calabria 160 447,87 354,48 — 373,38 553,37 587,45 422,06 525,07 623,56 526,20 368,63 568,09 556,77 634,37 352,10 563,61 358,67 521,68 461,23 652,37 587,33 161-200 449,64 356,25 — 375,15 555,14 589,22 423,83 526,84 625,33 527,97 370,40 569,86 558,54 636,14 353,87 565,38 360,44 523,45 463,00 654,14 589,10 201-249 520,40 427,01 — 445,92 625,90 659,98 494,59 597,60 696,09 598,74 441,16 640,62 629,30 706,90 424,64 636,14 431,20 594,21 533,76 724,90 659,86 250-300 607,09 513,70 — 532,60 712,59 746,66 581,28 684,29 782,77 685,42 527,85 727,31 715,99 793,58 511,32 722,82 517,89 680,89 620,44 811,58 746,55 301-600 697,31 603,92 — 622,82 802,81 836,88 671,50 774,51 873,00 775,64 618,07 817,53 806,21 883,81 601,54 813,04 608,11 771,12 710,67 901,81 836,77 > 600 1 228,03 1 134,64 — 1 153,54 1 333,53 1 367,61 1 202,22 1 305,23 1 403,72 1 306,36 1 148,79 1 348,25 1 336,93 1 414,53 1 132,26 1 343,77 1 138,83 1 301,84 1 241,39 1 432,53 1 367,49 Sicilia 160 523,88 473,06 434,34 471,93 650,78 683,72 496,83 590,33 693,80 574,94 499,21 668,89 666,97 632,33 506,34 544,54 — 632,67 548,22 709,08 662,10 161-200 526,13 475,30 436,59 474,17 653,02 685,96 499,07 592,57 696,04 577,18 501,45 671,14 669,21 634,57 508,58 546,79 — 634,91 550,46 711,32 664,34 201-249 615,81 564,98 526,27 563,85 742,70 775,65 588,75 682,26 785,72 666,86 591,13 760,82 758,89 724,25 598,26 636,47 — 724,59 640,15 801,00 754,02 250-300 725,67 674,84 636,13 673,71 852,56 885,51 698,61 792,12 895,58 776,72 700,99 870,68 868,75 834,11 708,12 746,33 — 834,45 750,01 910,86 863,88 301-600 840,01 789,18 750,47 788,05 966,91 999,85 812,96 906,46 1 009,92 891,06 815,33 985,02 983,10 948,46 822,46 860,67 — 948,80 864,35 1 025,21 978,23 > 600 1 512,62 1 461,79 1 423,08 1 460,66 1 639,52 1 672,46 1 485,57 1 579,07 1 682,53 1 563,67 1 487,94 1 657,63 1 655,71 1 621,07 1 495,08 1 533,28 — 1 621,41 1 536,96 1 697,82 1 650,84 Sardegna 160 410,58 452,31 508,68 418,35 417,07 507,25 384,77 452,27 407,64 479,33 413,98 501,59 475,39 416,05 507,55 — 413,94 417,53 439,11 433,48 476,69 161-200 412,01 453,73 510,10 419,77 418,49 508,68 386,20 453,70 409,06 480,75 415,40 503,02 476,81 417,47 508,97 — 415,37 418,96 440,53 434,91 478,11 201-249 469,04 510,76 567,14 476,80 475,52 565,71 443,23 510,73 466,09 537,78 472,43 560,05 533,84 474,50 566,00 — 472,40 475,99 497,56 491,94 535,15 250-300 538,90 580,63 637,00 546,67 545,39 635,57 513,09 580,59 535,96 607,65 542,30 629,91 603,71 544,37 635,87 — 542,26 545,85 567,43 561,80 605,01 301-600 611,61 653,34 709,71 619,38 618,10 708,29 585,80 653,31 608,67 680,36 615,01 702,63 676,42 617,08 708,58 — 614,98 618,56 640,14 634,51 677,72 > 600 1 039,35 1 081,07 1 137,45 1 047,11 1 045,83 1 136,02 1 013,54 1 081,04 1 036,4 1 108,09 1 042,74 1 130,36 1 104,15 1 044,81 1 136,31 — 1 042,71 1 046,3 1 067,87 1 062,25 1 105,46 3.5
Allowances for traineeships under transnational mobility (in EUR)
SAAdditional Week
MAAdditional Month
GAAdditional Day
Country Months SAf28 MAf29 GAf30 1 2 3 4 5 6 Austria 1 617 2 312 3 094 4 082 4 732 5 382 162,5 650,2 22,733 Belgium 1 501 2 183 2 841 3 719 4 305 4 890 151,0 585,3 21,575 Bulgaria 990 1 413 1 831 2 583 2 980 3 377 99,2 396,7 13,97 Cyprus 1 342 1 854 2 499 3 316 3 957 4 495 134,5 538,2 18,94 Czech Republic 1 365 1 876 2 522 3 369 4 018 4 564 136,5 546,17 19,51 Germany 1 477 2 114 2 751 3 749 4 344 4 939 148,7 594,67 21,24 Denmark 1 973 2 840 3 707 5 080,5 5 889 6 698 202,1 808,5 28,88 Estonia 1 504 2 226 2 949 3 765 4 366 4 968 150,3 601,33 21,48 Spain 1 552 2 199 2 860 3 894 4 514 5 133 154,8 619,17 22,11 Finland 1 806 2 587 3 351 4 537 5 260 5 982 180,6 722,5 25,80 France 1 771 2 533 3 295 4 451 5 162 5 873 177,8 711 25,39 United Kingdom 1 972 2 820 3 668 4 950 5 737 6 525 196,9 787,67 28,13 Hungary 1 255 1 790 2 324 3 223 3 727 4 231 126,1 504,33 18,01 Greece 1 402 2 000 2 598 3 674 4 251 4 828 144,2 576,83 20,60 Ireland 1 788 2 559 3 330 4 493 5 210 5 927 179,3 717,3 25,62 Iceland 1 614 2 312 3 011 4 062 4 710 5 358 162 648 23,14 Liechenstein 1 978 2 817 3 656 4 968 5 758 6 547 197,4 789,5 28,20 Lithuania 1 145 1 639 2 133 2 912 3 420 3 882 115,6 462,3 16,51 Luxembourg 1 501 2 148 2 794 3 802 4 406 5 010 151 604 21,57 Latvia 1 204 1 721 2 238 3 104 3 589 4 074 121,2 484,8 17,32 Malta 1 315 1 883 2 452 3 362 3 891 4 420 132,3 529 18,89 Netherlands 1 597 2 350 3 058 4 144 4 805 5 466 165,3 661,2 23,61 Norway 2 129 3 035 3 942 5 341 6 189 7 036 211,9 847,7 30,27 Poland 1 232 1 758 2 284 3 174 3 669 4 165 123,9 495,5 17,70 Portugal 1 371 1 959 2 548 3 492 4 041 4 591 137,4 549,5 19,63 Romania 1 056 1 507 1 958 2 745 3 170 3 596 106,3 425,3 15,19 Sweden 1 771 2 533 3 288 4 452 5 161 5 871 177,3 709,3 25,33 Slovenia 1 363 1 945 2 526 3 465 4 011 4 556 136,3 545,3 19,48 Slovakia 1 293 1 850 2 408 3 308 3 827 4 346 129,8 519,2 18,54 Turkey 1 194 1 706 2 218 3 071 3 552 4 033 120,3 481 17,18 Switzerland 1 879 2 579 3 279 4 670 5 370 6 070 175,0 700,0 25,00 Croatia 1 157 1 589 2 021 2 953 3 385 3 817 108 432 15,43 3.6
Allowances for interview(s)
Place or country of destination Distance (KM) Amount (EUR) Travel and accommodation Daily subsistence allowance (DSA) Any EU-28 or Iceland and Norway 0 - 50 0 50 / day (> 12 hours) 25/ day (> 6 - 12 hours) Max 3 days > 50 - 250 100 > 250 - 500 250 > 500 350 3.7
Allowance to move to another Member State (work placement)
Country of Destination Amount (EUR) Austria 1 025 Belgium 970 Bulgaria 635 Croatia 675 Cyprus 835 Czech Republic 750 Denmark 1 270 Estonia 750 Finland 1 090 France 1 045 Germany 940 Greece 910 Hungary 655 Iceland 945 Ireland 1 015 Italy 995 Latvia 675 Lithuania 675 Luxembourg 970 Malta 825 Netherlands 950 Norway 1 270 Poland 655 Portugal 825 Romania 635 Slovakia 740 Slovenia 825 Spain 890 Sweden 1 090 United Kingdom 1 060 3.8
Daily accommodation costs (in EUR)
Student daily allowances Staff daily allowances Country Group Country (Day 1-day 14) (Day 15-Day 60) (Day 1-day 14) (Day 15-Day 60) Group A United Kingdom 90 63 128 90 Group B Denmark 86 60 128 90 Group C Netherlands 83 58 128 90 Sweden 83 58 128 90 Group D Cyprus 77 54 112 78 Finland 77 54 112 78 Luxembourg 77 54 112 78 Group E Austria 74 52 112 78 Belgium 74 52 112 78 Bulgaria 74 52 112 78 Czech Republic 74 52 112 78 Group F Greece 70 49 112 78 Hungary 70 49 112 78 Switzerland 70 49 112 78 Liechtenstein 70 49 112 78 Norway 70 49 112 78 Poland 70 49 112 78 Romania 70 49 112 78 Turkey 70 49 112 78 Group G Germany 67 47 96 67 Spain 67 47 96 67 Latvia 67 47 96 67 FYROM 67 47 96 67 Malta 67 47 96 67 Slovakia 67 47 96 67 Group H Croatia 58 41 80 56 Estonia 58 41 80 56 Lithuania 58 41 80 56 Slovenia 58 41 80 56 Group I France 80 56 112 78 Ireland 80 56 128 90 Iceland 80 56 112 78 Group L Portugal 64 45 96 67
ANNEX VII
Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Slovakia
1.
Definition of standard scales of unit costs
There are two possible modules — 1) Base/Standard and 2) Advanced.
Type of operations Indicator name Category of costs Measurement unit for the indicators Amounts(in EUR) 1.
Professional development of employees in foreign language skills under Priority Axes 2, 3 and 4 of the Operational Programme Human Resources (2014SK05M0OP001)
45-minute period of foreign language training per employee All eligible costs of the operation, including direct costs of providing training. Number of completed 45-minute periods of foreign language training per employee. 8,53 2.
European Computer Driving Licence (ECDL certification under Priority Axes 1, 2 and 3 of Operational Programme Human Resources (2014SK05M0OP001)
ECDL certification All eligible costs of the operation, including direct cost of sitting examination and issuing certificate Number of ECDL certificates awarded, differentiated by profile and modulef31 Certificate Name Price ECDL Profile — 1 Base/Standard exam 31,50 ECDL Profile — 2 Base/Standard exams 59,00 ECDL Profile — 3 Base/Standard exams 76,50 ECDL Profile — 4 Base/Standard exams 92,00 ECDL Profile — 5 Base/Standard exams 111,50 ECDL Profile — 6 Base/Standard exams 127,00 ECDL Profile — 7 Base/Standard exams 142,50 ECDL Profile — 8 Base/Standard exams 163,00 ECDL Profile — 1 Advanced exam 39,10 ECDL Profile — 2 Advanced exams 74,30 ECDL Profile — 3 Advanced exams 99,40 ECDL Profile — 4 Advanced exams 122,50 3.
Inclusion in elementary schools under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001)
Occupation of newly created posts in inclusive teams Direct wage costs
Indirect costs
Number of months during which a newly created post in an inclusive team is occupied. School psychologist — 1 235 per month
Special pedagogue / social pedagogue — 1 440 per month
4.
Inclusion in kindergartens and elementary schools under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001)
Occupation of newly created posts for pedagogical assistants Direct wage costs
Indirect costs
Number of months during which a newly created post for a pedagogical assistant is occupied 1 005 per month 5.
Integration of pupils in kindergartens and schools under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001)
Occupation of a newly created teacher's assistant post Direct wage costs
Indirect costs
Number of months during which a newly created post of teachers assistant is occupied 865 per month 6.
Training of prospective teachers of higher eduaction facilities under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001)
One hour of analysis by a training teacher of a student's direct teaching activity unit (school class) or direct education activity (school facility) Direct wage costs
Indirect costs
Number of hours of direct analysis by a training teacher of students' direct teaching activity unit (school class) or direct education activity (school facility) 9,66 per hour 7.
Training of teaching and specialised staff under Priority Axis Education of Operational Programme Human Resources (2014SK05M0OP001)
One hour of participation in training for teaching and specialised staff Direct wage costs of the trainer and wages of the participant. Number of completed hours per participant in training for teaching and specialised staff Group of 20 participants: 10,10 per completed hour per participant
Group of 12 participants: 10,65 per completed hour per participant.
2.
Adjustment of amounts
Not Applicable.
‘ANNEX IX
Conditions for reimbursement of expenditure on the basis of unit costs and lump sums to the Netherlands
1.
Definition of standard scales of unit costs
For the purposes of types of operations 1 to 3, the period of intervention is the period between the date of intake and the date of exiting the reintegration activity.
Type of operations Indicators name Category of costs Measurement unit for the indicators Amounts(in EUR) 1.
Reintegration activities for detainees in the sector Prison Services
Priority Axis 1
OP 2014NL05SFOP001
Investment priority: 9i — Active inclusion
Calendar days of participation of a detainee during the period of interventionf32, in the sector Prison Services (GW). All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a detainee in the period of intervention 14,50 2.
Reintegration activities for detainees in forensic care (Forzo)
Priority Axis 1
OP 2014NL05SFOP001
Investment priority: 9i — Active inclusion
Calendar days of participation of a detainee during the period of intervention in the sector forensic care (Forzo) All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a detainee in the period of intervention. 21,00 3.
Reintegration activities for juvenile offenders and youth in institutions placed under supervision based on a court judgment under civil law
Priority Axis 1
OP 2014NL05SFOP001
Investment priority: 9i — Active inclusion
Calendar days of participation of a juvenile offender and a young person during the period of intervention in the sector Juvenile offenders and youth in custodial institutions under civil law (JI) All eligible costs (personnel costs, other direct and indirect costs). Number of calendar days of participation of a juvenile offender and a young person in the period of intervention. 26,50 2.
Adjustment of amounts
The amounts of unit costs set out for types of operation 1-3 will be adjusted yearly in line with the Dutch consumer price index (CPI): https://www.cbs.nl/nl-nl/conversie/uitgelicht/de-consumentenprijsindex. Index figures can be found on CBS Statline.
The first indexation will be calculated in 2017. The baseline year for the amounts of unit costs set out in this annex is 2015. (CPI 2015 = 100).
Every year (N), as from 2017, the amounts will be indexed by applying the CPI of the year N-1 with the year 2015 as baseline. The following formula will be used for calculating the amounts of unit costs to be applied in a given year:
Unit cost amounts in year N = Unit cost amounts included in this annex * CPI in year N-1 (with baseline 2015 = 100) / 100
3.
Definition of lump sum
See Article 119 of Regulation (EU) No 1303/2013: ‘The amount of the Funds allocated to technical assistance shall be limited to 4 % of the total amount of the Funds allocated to operational programmes in a Member State (…)’.
Type of operations Indicator name Category of costs Measurement unit for the indicator Amounts(in EUR) Technical Assistance
Priority axis 4
2014NL05SFOP001
New total expenditure included in a payment application (i.e. total eligible expenditure included in a payment application which has not yet been taken into account for calculating an installment of EUR 100 000). All elgible costs. Installments of EUR 100 000 of new total expenditure included in a payment application submitted to the European Commission until the maximum amountf33 budgeted under the technical assistance priority axis is reached. 5 690 4.
Adjustments of amounts
Not applicable.’
Annotations
Footnotes
- f1
-
The amounts of standard scales of unit costs apply only to the parts of operations that cover the categories of costs set out in this Annex.
- f2
-
The total number of hours declared in a year must not be higher than the standard number of annual hours worked in Sweden, which is equal to 1 862 hours.
- f3
-
Professional code applicable in Sweden.
- f4
-
Currency in Sweden.
- f5
-
In each case listed below, the categories of costs mentioned cover all costs associated with that operation, except for types of operations 1 and 2, which may also include other categories of costs.
- f6
-
Meaning a new place which is included in the capacity of the new childcare facility as recorded by national regulations, and which has proof of equipment for each new place provided.
- f7
-
A children's group means it has been registered as a children's group pursuant to national legislation on the provision of childcare services in a children's group.
- f8
-
Meaning a place in an existing facility which is newly registered as a children's group in accordance with national legislation and inlcuded in the official capacity of that group, and which has proof of equipment for each place.
- f9
-
The occupancy rate is defined as the number of children attending the childcare facility per half day during 6 months divided by the maximum capacity of the facility per half day during 6 months, multiplied by 100.
- f10
-
This amount will be paid for each 1 % point of occupancy per place up to a maximum of 75 % points for a period of 6 months. If the occupancy rate is less than 20 % there will be no reimbursement.
- f11
-
i.e. provided by an internal trainer.
- f12
-
Tandem lesson is to be understood as two pedagogues cooperating to mutually strengthen their professional development by jointly planning, implementing and reflecting on teaching methods in a class.
- f13
-
As defined in Regulation (EU) No 651/2014.
- f14
-
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 1.B of NOP YEI but with different target groups.
- f15
-
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 1.C of NOP YEI but with different target groups.
- f16
-
‘Similar operations’ are to be understood as including those operations with similar activities to those in measures 2A, 2B, 4A, 4C and 7.1 of NOP YEI but with different target groups.
- f17
-
For unit cost number 3 relating to training for self-employment and self-entrepreneurship, the amount will be reimbursed only in the case of group formation of 4 or more students.
- f18
-
The definition of the classes is in accordance with the provisions of Ministerial Circular no. 2 of 2 February 2009. This Circular defines the classes according to the type of teachers providing training.
- f19
-
Similar operations is to be understood as including those operations with similar activities to those in measure 3 of NOP YEI but with different target groups.
- f20
-
The young person will be profiled according to one of the four classes (low, medium, high, very high) on the basis of the following variables:
-
age;
-
sex;
-
education;
-
employment status one year before;
-
region and province where the competent body which took in charge the young is based;
-
language skills (only for non-nationals who have not obtained the educational qualification in Italy), for the evaluation of which will be used the already developed methodology for the issuance of an EC residence permit for long-term residents.
Based on the variables identified for the young, a “disadvantage coefficient” is calculated, with a value between 0 and 1.
-
- f21
-
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 5 of NOP YEI but with different target groups.
- f22
-
‘Similar operations’ are to be understood as including those operations with similar activities to those in NOP YEI but with different target groups.
- f23
-
‘Similar operations’ is to be understood as including those operations with similar activities to those in measure 7.1 of NOP YEI but with different target groups.
- f24
-
For unit cost number 8 relating to support for self-employment and self-entrepreneurship, the amount will be reimbursed only in the case of individual or individualised training (‘individualised’ meaning a maximum of 3 students).
- f25
-
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 8 of NOP YEI but with different target groups.
- f26
-
The amounts in table 3.4 are the maximum allowance payable. Where an employer provides an allowance to cover travel, accommodation or meals, the allowance mentioned in point 3.4 will be reduced by:
-
the amount mentioned in point 3.1 for travel (depending on location)
-
the amount mentioned in point 3.2 for accommodation (depending on location)
-
the amount mentioned in point 3.3 for meals (depending on location).
The amounts mentioned in tables 3.1, 3.2 and 3.3. will also be payable in a situation where the beneficiary pays only the categories of allowances mentioned in those tables.
-
- f27
-
Additional specific support is limited to one unit per student per module.
- f28
- SA
Additional Week
- f29
- MA
Additional Month
- f30
- GA
Additional Day
- f31
-
There are two possible modules — 1) Base/Standard and 2) Advanced.
- f32
-
For the purposes of types of operations 1 to 3, the period of intervention is the period between the date of intake and the date of exiting the reintegration activity.
- f33
-
See Article 119 of Regulation (EU) No 1303/2013: ‘The amount of the Funds allocated to technical assistance shall be limited to 4 % of the total amount of the Funds allocated to operational programmes in a Member State (…)’.