# Commission Regulation (EU) 2017/2196 of 24 November 2017 establishing a network code on electricity emergency and restoration (Text with EEA relevance), Annex

Extent: E+W+S+N.I.

Automatic low frequency demand disconnection scheme characteristics:
Parameter
...
...
Values SA Great Britain
...
Measuring Unit
Demand disconnection starting mandatory level:
Frequency
. . .
. . .
48,8
. . .
Hz
Demand disconnection starting mandatory level:
Demand to be disconnected
. . .
. . .
5
. . .
% of the Total Load at national level
Demand disconnection final mandatory level:
Frequency
. . .
. . .
48
. . .
Hz
Demand disconnection final mandatory level:
Cumulative Demand to be disconnected
. . .
. . .
50
. . .
% of the Total Load at national level
Implementation range
. . .
. . .
± 10
. . .
% of the Total Load at national level, for a given Frequency
Minimum number of steps to reach the final mandatory level
. . .
. . .
4
. . .
Number of steps
Maximum Demand disconnection for each step
. . .
. . .
10
. . .
% of the Total Load at national level, for a given step

---
Source: https://www.legislation.gov.uk/eur/2017/2196/annex (the official version)
Page: https://openlegislation.uk/eu-regulation-2017-2196/annex
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

