{
  "url": "https://openlegislation.uk/eu-regulation-2017-2196/article-19",
  "json_url": "https://openlegislation.uk/eu-regulation-2017-2196/article-19.json",
  "legislation": "eur/2017/2196",
  "legislation_title": "Commission Regulation (EU) 2017/2196 of 24 November 2017 establishing a network code on electricity emergency and restoration (Text with EEA relevance)",
  "legislation_url": "https://openlegislation.uk/eu-regulation-2017-2196",
  "path": "article/19",
  "kind": "article",
  "number": "19",
  "heading": "Voltage deviation management procedure",
  "text": "1. The procedure for the management of voltage deviations of the system defence plan shall contain a set of measures to manage voltage deviations outside the operational security limits set out in Article 25 of Regulation (EU) 2017/1485.\n2. Each TSO shall be entitled to establish a reactive power range or voltage range and instruct the DSOs and SGUs identified for this measure pursuant to Article 11(4) to maintain it, in accordance with Articles 28 and 29 of Regulation (EU) 2017/1485.\n3. Upon request of neighbouring TSO in emergency state, each TSO shall make available all reactive power capabilities that do not lead its transmission system into emergency state or blackout state.",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eur/2017/2196/article/19",
    "retrieved_at": "2026-11-01T14:44:25.137740+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}