# Commission Regulation (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and repealing Regulation (EU) No 984/2013 (Text with EEA relevance), Article 36: Reasons for interruptions

Extent: E+W+S+N.I.

Transmission system operators shall include reasons for interruptions either directly in their interruptible transport contracts or in the general terms and conditions that govern these contracts. Reasons for interruptions can include but are not limited to gas quality, pressure, temperature, flow patterns, use of firm contracts, maintenance, up- or downstream constraints, public service obligations and capacity management deriving from congestion management procedures.

---
Source: https://www.legislation.gov.uk/eur/2017/459/article/36 (the official version)
Page: https://openlegislation.uk/eu-regulation-2017-459/article-36
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

