Division Calculation of expected values for intermediate holding periodsF1
United Kingdom Repealed
- 19Division 19
- 20Division 20
- 21Division 21
- 22Division 22
- 23Division 23
- 24For Category 3 PRIIPs, to produce the favourable, moderate, unfavourable and stress scenarios at an intermediate period before the end of the recommended holding period, the manufacturer shall pick three underlying simulations as referred to in points 16 to 24 of Annex II used for the calculation of the MRM and one underlying simulation as referred to in point 13 of this Annex, on the basis of underlying levels only and in such a manner that the simulated value of the PRIIPs for that intermediate period is likely to be consistent with the relevant scenario.
- 25Division 25
- 26Division 26
- 27Division 27
- 28Division 28
- 29Division 29
- 30Division 30
Annotations
Textual amendments
- F1
Regulation revoked (6.4.2026) by Financial Services and Markets Act 2023 (c. 29), s. 86(3), Sch. 1 Pts. 1, 3 (with s. 1(4)); S.I. 2025/1078, reg. 7(d)(ii)