OpenLegislation

Division 5 RegenerationF1

United Kingdom

Original text. Later amendments are not shown.

In the case that a regeneration event occurs during or immediately preceding the procedure set out in point 4, upon completion of that procedure the test may be voided at the request of the manufacturer, irrespective of the cause of the regeneration. In this case the test shall be repeated. The same torque and speed points shall be used although the running order may be changed. It shall not be deemed necessary to repeat any torque and speed points for which a pass result has already been obtained. The following procedure shall be used for repeating the test:

  1. (a)

    The engine shall be operated in a manner to ensure that the regeneration event has completed and, where applicable, the soot load in the particulate after-treatment system has been re-established;

  2. (b)

    The engine warm-up procedure shall be performed in accordance with point 7.8.1.1 of Annex VI;

  3. (c)

    The test procedure specified in point 4 shall be repeated commencing at the stage referred to in point 4(b).

Annotations

Textual amendments

F1

Inserted by Commission Delegated Regulation (EU) 2018/989 of 18 May 2018 amending and correcting Delegated Regulation (EU) 2017/654 supplementing Regulation (EU) 2016/1628 of the European Parliament and of the Council with regard to technical and general requirements relating to emission limits and type-approval for internal combustion engines for non-road mobile machinery (Text with EEA relevance).