Division 7.3.2 Post-test procedures United Kingdom Original text. Later amendments are not shown. The following steps shall be taken after emission sampling is complete: 7.3.2.1Verification of proportional sampling 7.3.2.2Post-test PM conditioning and weighing 7.3.2.3Analysis of gaseous batch sampling 7.3.2.4Drift verification ← Division 7.3.1.6 Division 7.3.2 Division 7.3.2.1 →