# Commission Delegated Regulation (EU) 2017/654 of 19 December 2016 supplementing Regulation (EU) 2016/1628 of the European Parliament and of the Council with regard to technical and general requirements relating to emission limits and type-approval for internal combustion engines for non-road mobile machinery, Division 8.1.8.5.7: PM secondary dilution system verification

Extent: E+W+S+N.I.

When the propane check is to be repeated to verify the PM secondary dilution system, the following procedure from (a) to (d) shall be used for this verification:
(a) The HC sampling system shall be configured to extract a sample near the location of the batch sampler's storage media (such as a PM filter). If the absolute pressure at this location is too low to extract an HC sample, HC may be sampled from the batch sampler pump's exhaust. Caution shall be used when sampling from pump's exhaust because an otherwise acceptable pump leak downstream of a batch sampler flow meter will cause a false failure of the propane check;
(b) The propane check shall be repeated as described in this point, but HC shall be sampled from the batch sampler;
(c) C3H8 mass shall be calculated, taking into account any secondary dilution from the batch sampler;
(d) The reference C3H8 mass shall be subtracted from the calculated mass. If this difference is within ± 5 % of the reference mass, the batch sampler passes this verification. If not, corrective action shall be taken.

---
Source: https://www.legislation.gov.uk/eur/2017/654/annex/VI/division/8/division/8.1/division/8.1.8/division/8.1.8.5/division/8.1.8.5.7 (the official version)
Page: https://openlegislation.uk/eu-regulation-2017-654/annex-VI/division-8/division-8.1/division-8.1.8/division-8.1.8.5/division-8.1.8.5.7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

