# Commission Delegated Regulation (EU) 2017/654 of 19 December 2016 supplementing Regulation (EU) 2016/1628 of the European Parliament and of the Council with regard to technical and general requirements relating to emission limits and type-approval for internal combustion engines for non-road mobile machinery, Division 8.1.8.6.2: Calibration of differential flow measurement

Extent: E+W+S+N.I.

The partial flow dilution system to extract a proportional raw exhaust gas sample shall be periodically calibrated with an accurate flow meter traceable to international and/or national standards. The flow meter or the flow measurement instrumentation shall be calibrated in one of the following procedures, such that the probe flow qm p into the tunnel shall fulfil the accuracy requirements of point 8.1.8.6.1.
(a) The flow meter for qm dw shall be connected in series to the flow meter for qm dew, the difference between the two flow meters shall be calibrated for at least 5 set points with flow values equally spaced between the lowest qm dw value used during the test and the value of qm dew used during the test. The dilution tunnel may be bypassed;
(b) A calibrated flow device shall be connected in series to the flowmeter for qm dew and the accuracy shall be checked for the value used for the test. The calibrated flow device shall be connected in series to the flow meter for qm dw, and the accuracy shall be checked for at least 5 settings corresponding to dilution ratio between 3 and 15, relative to qm dew used during the test;
(c) The transfer line TL (see Figure 6.7) shall be disconnected from the exhaust system and a calibrated flow measuring device with a suitable range to measure qm p shall be connected to the transfer line. qm dew shall be set to the value used during the test, and qm dw shall be sequentially set to at least 5 values corresponding to dilution ratios between 3 and 15. Alternatively, a special calibration flow path may be provided, in which the tunnel is bypassed, but the total and dilution air flow is passed through the corresponding meters as in the actual test;
(d) A tracer gas, shall be fed into the exhaust system transfer line TL. This tracer gas may be a component of the exhaust gas, like CO2 or NOx. After dilution in the tunnel the tracer gas component shall be measured. This shall be carried out for 5 dilution ratios between 3 and 15. The accuracy of the sample flow shall be determined from the dilution ratio r d by means of equation (6-21):
qm p = qm dew / r d
(6-21)
The accuracies of the gas analyzers shall be taken into account to guarantee the accuracy of qm p.

---
Source: https://www.legislation.gov.uk/eur/2017/654/annex/VI/division/8/division/8.1/division/8.1.8/division/8.1.8.6/division/8.1.8.6.2 (the official version)
Page: https://openlegislation.uk/eu-regulation-2017-654/annex-VI/division-8/division-8.1/division-8.1.8/division-8.1.8.6/division-8.1.8.6.2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

