Division 8.1.8.6.3.1 Pre-test check
United Kingdom
A pre-test check shall be performed within 2 hours before the test run in the following way.
The accuracy of the flow meters shall be checked by the same method as used for calibration (see point 8.1.8.6.2) for at least two points, including flow values of qm dw that correspond to dilution ratios between 5 and 15 for the qm dew value used during the test.
If it can be demonstrated by records of the calibration procedure under point 8.1.8.6.2 that the flow meter calibration is stable over a longer period of time, the pre-test check may be omitted.