# Commission Delegated Regulation (EU) 2017/654 of 19 December 2016 supplementing Regulation (EU) 2016/1628 of the European Parliament and of the Council with regard to technical and general requirements relating to emission limits and type-approval for internal combustion engines for non-road mobile machinery, Division 8.1.8.7.3: Low-flow leak test

Extent: E+W+S+N.I.

A sampling system shall be tested for low-flow leaks as follows:
(a) The probe end of the system shall be sealed by taking one of the following steps:
(i) The end of the sample probe shall be capped or plugged;
(ii) The transfer line shall be disconnected at the probe and the transfer line capped or plugged;
(iii) A leak-tight valve in-line between a probe and transfer line shall be closed;
(b) All vacuum pumps shall be operated. After stabilizing, it shall be verified that the flow through the vacuum-side of the sampling system is less than 0,5 % of the system's normal in-use flow rate. Typical analyzer and bypass flows may be estimated as an approximation of the system's normal in-use flow rate.

---
Source: https://www.legislation.gov.uk/eur/2017/654/annex/VI/division/8/division/8.1/division/8.1.8/division/8.1.8.7/division/8.1.8.7.3 (the official version)
Page: https://openlegislation.uk/eu-regulation-2017-654/annex-VI/division-8/division-8.1/division-8.1.8/division-8.1.8.7/division-8.1.8.7.3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

