Division 2.6.1.3
United Kingdom
When the manufacturer cannot fulfil the requirement under point 2.6.1 due to an unavailability of engines with the required service accumulation, the approval authority shall not reject a change to the testing scheme based on a 4 years' period set out in point 2.6.2. Engines already tested in accordance with point 2.6.1 shall remain valid under point 2.6.2.
F1Table 1
% of EDP values
| Reference power of selected engine (kW) | a | b |
|---|---|---|
| 56 ≤ P < 130 | 20 | 55 |
| 130 ≤ P ≤ 560 | 30 | 70 |