Division 4.2.2
United Kingdom
The following additional requirements shall be fulfilled when applying combined data sampling:
- (a)
the different operating sequences shall be obtained using the same non-road mobile machinery and engine;
- (b)
the combined data sampling shall contain a maximum of three operating sequences;
- (c)
each operating sequence in the combined data sampling shall contain a minimum of one Non-Road Transient Cycle (NRTC) work;
- (d)
the operating sequences in the combined data sampling shall be obtained and put together in a chronological order;
- (e)
the data analysis shall be applied to the complete combined data sampling;
- (f)
the maximum period elapsed between the first and last operating sequence shall be 72 hours;
- (g)
combined data sampling shall not be used if an engine malfunction occurs, as set out in point 8 of Appendix 2.